Laserfiche WebLink
, � <br /> Task 2:Ci Attorne 's Office three 3 doors Cost <br /> • One Galaxy 600 pack 6 controller to replace existing 500 series panel in A/V room <br /> behind Council Chambers 5,083.79 <br /> • One Altronix AL400ULACM 24VDC lock power supply in A/V room behind Council <br /> Chambers $408.50 <br /> • Two 8G22g shielded plenum wire and one 2c/18g plenum wire from Galaxy panel <br /> to each door, wire ath from anel to doors to be rovided b others , $1,212.00 <br /> • One Far ointe P500H card reader at each door, of 3 $729.00 <br /> • One Schla e L9080EU electrified lock chassis $643.60 <br /> • One Command Access ETH2W wire transfer hin e at each door. of 3 $1,242.00 <br /> Total Task 1: Ci Mana er's Office 2 doors $5,469.11 <br /> Total Task 2:Cit Attorne 's Office 3 doors $9,318.89 <br /> Tax on Materials $74�•72 <br /> Contract Total(Installation and Material): $15,535.72 <br /> TIME SCHEDULE: <br /> Contractor shall start all work within one (1) Calendar day of the City's notice to proceed. <br /> All work shall be completed no later than October 30, 2013 <br /> ATTY/AGR/2013.120/LOCKWORKS UNLIMITED($15,535.72) <br /> REV:07-23-13 VR <br /> Page 6 of 6 <br />