My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso13 PC 13-16 2898 PC Reso Recommending Stanford EIR Certification
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2013
>
Reso13 PC 13-16 2898 PC Reso Recommending Stanford EIR Certification
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2013 9:39:20 AM
Creation date
8/22/2013 9:34:50 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
8/20/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
paying its Traffic Impact Fee in effect at time of paymant and issuance of a <br /> building permit. Applicant's full funding or constr�ction of the impro�ement, <br /> subject to potential reimbursement as pro�ided in the Precise �'lan, wauld a�so <br /> mitigate the project's contributian to this impact. <br /> Finding: Implemenfation of M�tigation 7-8(a) would improve the level of service (LOS) at <br /> this intersectian to an acceptable LOS C in the AM pealC hour and L�S D in the <br /> PM peak hour, res�lting in a less-fha►r-sigr��cant impact. <br /> or <br /> Implementation of Mitigation 7-8(b) wauld improve the �evel of service {LOS} at <br /> this intersection ta an acceptable L�5 B during the AM peak hour and k.OS C <br /> during the PM peak hour, resuftir�g in a less-than-significanf impact. <br /> Facts in Support of Finding: lmplementation of either aption for Mitigation 7-8 would reduce <br /> the project's tra�c irnpact at the Charter Street/Bay Road intersection to a less- <br /> than-significant le�el. Mi#igation option 7-8(a} requires a combination of a traffic <br /> signal with protected and permifted phasing (to replace the current Stop signs} <br /> and restriping; Mitigation option 7-8{b) requires the design and construction of a <br /> single-lane raundabout. In either case, the project would mitigate its contribution <br /> to the impact by contributing its fair share (estimated to be 41 percent)toward the <br /> cost of the improvement or, if in efFect at building permit issuance, by payFng its <br /> Ciry Traffic Impact Fee. These facts are described in Draft EfR chapter 7 <br /> (Transpo�tation, Circulation, and Parking) on pages 7-1 through 7-70, Draft EIR <br /> appendix 2�.3 (Supplementai Transpartation Information), and Final EIR <br /> appendix A {5upplemental Traffic information}, which are hereby incorporated by <br /> re#erence. <br /> fmpact: Impact 7-9: Near Term Plus Project Impact on Douglas AvenuelBroadway <br /> Intersection. Under Near Term Plus Praject conditions during the AM peak <br /> hour, project traffic would cause the intersectiQn to degrade from L05 C (21.9 <br /> seconds) to LOS F (179.1 seconds). During the PM peak hour, the in#ersection <br /> would cantinue to operate at LOS F, but project trafFic Wouid cause the critical <br /> delay at the intersection to increase from 5�4.5 seconds ta 223.4 seconds (i.e., by <br /> 168.9 seconds). In additian, this intersection would have peak hour volume <br /> increases larg� enough under bo#h peak hours to satisfy the peak hour signal <br /> warrant. <br /> Mitigation: Mi�igation 7-9. Implement Mitigatior� 7-� (the project applicant would be <br /> responsible far fully fundinglcompleting the mitigation). <br /> Finding: Implementation of Mitigation 7-9 would imprave the le�el of service (LOS) at this <br /> intersection to an acceptable LOS C during both peak hours, resulting in a less- <br /> than-sign�cant impacf. <br /> Facts in Support of Find�ng: Implementation of Mitigation 7-9 would reduce the project's <br /> traffic irrzpact at the Dauglas AvenuelBroadway i�tersection to a less-than- <br /> signifECant level thraugh a combination of a traffic signal with protected phasing <br /> (to replace th� current Stop signs) and roadway restriping. This mitigation would <br /> ATTY/RE50.2898/PC RE50 RECOMMENDING STANFORp�lli C�RTIFICATIpN <br /> REV'U&15-13 VR <br /> Page 33 of 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.