Laserfiche WebLink
• Palicy BE-4'!.3 (minimized groundwater infiltration and inflow} <br /> • Goai BE�32 (diverse and f�ealthy eoonamy) <br /> Jobs <br /> fmplernen#ation of the Project will generate #emporary construction jobs and will bring <br /> additional employees to Redwoad City, which the City fir�ds will pramote and enhance a healthy <br /> and di�erse economy in the City. <br /> Environmental Benefits <br /> Implementation of the Praject will provide far extension of recycled water service to the <br /> site, replacement of all existing inefficient piumbing fixtures, coRtributior� ta the Main City <br /> Service Area emergency water storage tank program, replacemen# of on-site �itreous clay <br /> wastewater pipelines that are subject to inflow and infrltration, reduction of impervious surFaces <br /> an fhe site, flood-praofng of buildings, and storage of storm water in apen space and greenway <br /> areas rather than on parking lots. In addition, implementation of the Project will provide 2.4 <br /> acres of publicly accessible open space; replace older buildings with neW buildings constructed <br /> to meet the latest seismic and engineering standards; and impro�e the visual character and <br /> quality of the Project de►►elopment site, including creating a more coherent farm, scale, and <br /> character within the Precise Plan area. The Project includes a Neighborhood Streets <br /> Enhancement Program to eni�ance residen#'s enjoyment of their streets, sidewalks, and <br /> neighbarhaods. <br /> F'lexibility and Definitiveness <br /> Implementatian of tF�e Project will pra�ide flexible building forms to allow for lang-term <br /> tenanting and re-tenanting by office, research and development {R&D), medical clinic, and other <br /> potentia! uses. The F'lan's policy envela�pe for development intensity, build�ng heights and <br /> orientation, architectura! design, circuiation, parking, and other components is intended to be <br /> fiexible enough ta allow far changing conditions, but definitive enaugh to ensure that the City's <br /> vision far the Precise Plan �rea is achie�ed. <br /> A7TY/RE5a.2898/PC RE50 RECQMMENDING STANFORD EIR CERTIFICATION <br /> REV:08-15-13 VR <br /> Page 56 of 56 <br />