Laserfiche WebLink
6.1.C. - Page 13 <br /> Task 9 Finaf Spec�fic Plan <br /> Following final City Council action on the Draft Specific Plan, consultant will revise the <br /> documer�t to incarporate any revisions directed through the public hearing process. An <br /> allowance is included in the project budget.. <br /> Phase B Meetings and Deliverables <br /> ■ Adrrzinistrati�e Draft Specific Plan <br /> ■ Preliminary Draft Specific Plan <br /> ■ Task Force Meeting 7 <br /> ■ Draft Specific Plan <br /> ■ Hearing presen#ation materials <br /> ■ Final Specific Plan <br /> ■ Website <br /> Task 1Q Ongoing Tasks <br /> 10.1 Website <br /> For the duration of the project, consultant will post materials created far Task Farce and <br /> public review. This is anticipated to include: <br /> ■ Technical memoranda, Opportunity and Constraints, Evaluatiorr Criteria <br /> • Task Force ager�das and meeting summaries <br /> ■ Preliminary alternati�es <br /> ■ Alternati�es <br /> - Workshop and Study Session materials <br /> ■ Photo library of project area with photos keyed to maps <br /> • Reference library of related dacuments (i.e. General Plan, Vision Plan, BCDC <br /> documents, etc.) <br /> ATTY/AGR/Z013.123/MIG Inner Harbor Amendment No.1 <br /> REV:07-Z4-13 VR <br /> Page 10 nf 13 <br />