My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-08-26
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-08-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 5:10:00 PM
Creation date
8/22/2013 4:35:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
8/26/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.H. - Page 1 <br /> RE PO RT <br /> To the Honorable Mayor and City Council <br /> From the Cit Mana er <br /> August 26, 2013 <br /> SUBJECT <br /> Network switch replacement in City Hall <br /> RECOMMENDATION <br /> Approve, by motion, the purchase of two Cisco network switches and 3-years support in <br /> the amount of $230,707.38 from CDW-G. <br /> BACKGROUND <br /> When City Hall was built in 1997, two Cisco network switches were installed in the data <br /> center to connect all the servers and desktops in City Hall as well as to communicate <br /> with all Redwood City remote facilities. The two switches are considered the core of the <br /> City's entire networking infrastructure and almost all network communication passes <br /> through them. They are responsible for managing network security, data flow, and <br /> connectivity. <br /> In 2009, minor upgrades to these switches allowed us to increase their connectivity <br /> speeds and extend their useful life. <br /> These two switches are no longer sold or supported by Cisco and parts are becoming <br /> increasingly difficult to find. They can no longer be upgraded to meet the City's <br /> increasing need for bandwidth to support all the technologies being implemented <br /> currently or in the known future. <br /> In July 2013, one of the switch's main components, its supervisory engine (SE), failed <br /> during the restart after the power was shut down during the City Hall remodel. The SE is <br /> the "brains" of the switch and controls all the security, network traffic, and configuration <br /> of the switch. Each switch contains a backup SE in the event the primary fails, thus the <br /> switch is still operational. Should the backup SE fail, the City will be without a major part <br /> of its network infrastructure, including connectivity to several facilities. Although a <br /> replacement SE costs about $10,000, these switches have reached the end of their <br /> expected useful life and replacing the failed SE would be a short-term solution. <br /> Not only are the switches beyond their useful life but taking them apart to replace failed <br /> parts leaves us vulnerable to other components failing when attempting to restart them, <br /> as witnessed after the power outage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.