My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-09-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-09-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2013 11:04:42 AM
Creation date
9/5/2013 5:04:57 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.A. - Page 6 <br /> EXHIBIT "A" <br /> SCOPE OF SERVICES AND FEE <br /> TASKS: CONCEPTUAL DESIGN <br /> Consultant shall perform the following tasks: <br /> 1. Easement Assessment to verify the various land-owners and easements that <br /> exist in the alignment of the proposed project. <br /> 2. Geotechnical Assessment - Collect available soils data and perform geotechnical <br /> evaluation to assess underlying soil conditions. Reconnaissance level field <br /> investigation will be conducted - no soil exploration (soil borings, sampling, and <br /> testing) included. Preliminary recommendations for foundations of water control <br /> structures will be made. <br /> 3. Land Surveying - Supplement/validate the City's available LiDAR topographic <br /> data with initial field surveys along the open-channel ditch, at the proposed <br /> crossing under Marsh Road, at the locations of proposed inlet/outlet headwall <br /> structures, and along the interior berms within Ponds S5/R5. <br /> 4. Jurisdictional Wetlands Delineation to assess the extent of jurisdictional wetlands <br /> within the open-channel ditch that will be impacted by the proposed project and <br /> will have to be mitigated for. <br /> 5. Prepare additional water quality and salinity sampling and formulate a sampling <br /> plan/protocol. <br /> 6. Summarize the information from the above tasks into the Conceptual Design <br /> Report. <br /> 7. Coordinate with the environmental permitting consultant (URS) for the South <br /> Bay Salt Ponds Restoration Project and provide them with information to support <br /> the development of a project description for the NEPA/CEQA document for the <br /> Bayfront Canal project. <br /> 8. Coordinate with Stanford University staff and their consultants to understand the <br /> implications of the proposed project on their infrastructure. Conduct additional <br /> hydrologic and hydraulic modeling by including increased flow from the <br /> proposed 5th Avenue Pump Station project into Bayfront Canal. It is very likely <br /> that this additional modeling will have to be done by combining various tidal and <br /> flood stage levels. <br /> DEL/1/ER,46LE.- <br /> Conceptual Design Report including Concept Design drawings (Draft and Final <br /> Versions) <br /> REV:08-30-13 VR <br /> ATTY/AGR/2013/AMENDMENTS/AMEND N0.3 MOFFATT&NICHOL <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.