My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-09-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-09-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2013 11:04:42 AM
Creation date
9/5/2013 5:04:57 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 42 ATfACHMENT 1 <br /> Mitigation: Mitigation 7-8(a). To mitigate the project's impact at the intersection of Charter <br /> Street and Bay Road, the intersection would need to be signalized with protected <br /> phasing on the eastbound and westbound approaches on Bay Road, and <br /> permitted phasing on the northbound and southbound approaches on Charter <br /> Street. In addition to signalization, the eastbound and westbound approaches <br /> would need to be restriped to include a total of one left-turn lane and one shared <br /> through/right-turn lane. <br /> Traffic from the proposed project would add 10.0 seconds to the PM peak hour <br /> delay at this intersection over Near Term No Project conditions (see Draft EIR <br /> Table 7.11); other Near Term growth would add 14.5 seconds to the delay over <br /> Existing conditions. <br /> Therefore, it is assumed that the proposed project would contribute <br /> approximately 41 percent toward this impact. The proposed project would <br /> mitigate its contribution to this impact by contributing its fair share to a mitigation <br /> fund established to pay for the cost of this improvement (estimated, based on the <br /> Draft EIR, to be 41 percent) at the time of issuance of a building permit or, if the <br /> City adds the improvement to its Traffic Impact Fee Program (TIF) project list, the <br /> proposed project would mitigate its contribution to this impact by paying its Traffic <br /> Impact Fee in effect at time of payment and issuance of a building permit. <br /> Applicant's full funding or construction of the improvement, subject to potential <br /> reimbursement as provided in the Precise Plan, would also mitigate the project's <br /> contribution to this impact. <br /> or <br /> Mitigation 7-8(b). Mitigation of the project's impact at the intersection of Charter <br /> Street and Bay Road would require the conversion of the all-way stop controlled <br /> unsignalized intersection to a single-lane roundabout. Standard roundabouts are <br /> at least 110 feet in diameter. Smaller roundabouts may operate efficiently down <br /> to 80 feet in diameter. The existing intersection at Charter Street and Bay Road <br /> would allow up to an 80-foot-diameter roundabout. If the design work shows that <br /> the 80-foot-diameter roundabout would not require the acquisition of additional <br /> right-of-way and would not create additional safety hazards for motorists, <br /> pedestrians, or bicyclists compared to Mitigation 7-8(a), and if substantial <br /> evidence at the time the roundabout is proposed shows that the roundabout <br /> would not divert traffic to other intersections, the roundabout shall be considered <br /> feasible and may be substituted for Mitigation 7-8(a). <br /> Traffic from the proposed project would add 10.0 seconds to the PM peak hour <br /> delay at this intersection over Near Term No Project conditions (see Draft EIR <br /> Table 7.11); other Near Term growth would add 14.5 seconds to the delay over <br /> Existing conditions. Therefore, it is assumed that the proposed project would <br /> contribute approximately 41 percent toward this impact. The proposed project <br /> would mitigate its contribution to this impact by contributing its fair share to a <br /> mitigation fund established to pay for the cost of this improvement (estimated, <br /> based on the Draft EIR, to be 41 percent) at the time of issuance of a building <br /> permit or, if the City adds the roundabout to its Traffic Impact Fee Program (TIF) <br /> project list, the proposed project would mitigate its contribution to this impact by <br /> ATTY/RES0.2901/STANFORD EIR CERTIFICATION <br /> REV:08-29-13 VR <br /> Page 32 of 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.