My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2013
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2013 1:28:45 PM
Creation date
9/11/2013 4:27:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/09/2013 <br /> • Policy BE-41.3 (minimized groundwater infiltration and inflow) <br /> • Goal BE-32 (diverse and healthy economy) <br /> Jobs <br /> Implementation of the Project will generate temporary construction jobs and will bring <br /> additional employees to Redwood City, which the City finds will promote and enhance a healthy <br /> and diverse economy in the City. <br /> Environmental Benefits <br /> Implementation of the Project will provide for extension of recycled water service to the <br /> site, replacement of all existing inefficient plumbing fixtures, contribution to the Main City <br /> Service Area emergency water storage tank program, replacement of on-site vitreous clay <br /> wastewater pipelines that are subject to inflow and infiltration, reduction of impervious surfaces <br /> on the site, flood-proofing of buildings, and storage of storm water in open space and greenway <br /> areas rather than on parking lots. In addition, implementation of the Project will provide 2.4 <br /> acres of publicly accessible open space; replace older buildings with new buildings constructed <br /> to meet the latest seismic and engineering standards; and improve the visual character and <br /> quality of the Project development site, including creating a more coherent form, scale, and <br /> character within the Precise Plan area. The Project includes a Neighborhood Streets <br /> Enhancement Program to enhance residenYs enjoyment of their streets, sidewalks, and <br /> neighborhoods. <br /> Flexibility and Definitiveness <br /> Implementation of the Project will provide flexible building forms to allow for long-term <br /> tenanting and re-tenanting by office, research and development (R&D), medical clinic, and other <br /> potential uses. The Plan's policy envelope for development intensity, building heights and <br /> orientation, architectural design, circulation, parking, and other components is intended to be <br /> flexible enough to allow for changing conditions, but definitive enough to ensure that the City's <br /> vision for the Precise Plan area is achieved. <br /> ATTY/RES0.2901/STANFORD EIR CERTIFICATION RESO.#15294 <br /> REV:09-10-13 VR MUFF#100 <br /> Page 55 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.