Laserfiche WebLink
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> cover of buildings, pavements and accordance with the provisions of the prior to building <br /> landscaping,potentially leaving soils exposed projecYs City-approved Stormwater permit issuance;field <br /> to wind and water erosion during the Pollution Prevention Plan(SWPPP). The verify implementation <br /> construction period. Eroded soils would be erosion control plan would be implemented during grading and <br /> washed into on-site drainage facilities that throughout project construction,and would construction <br /> discharge to the Bayfront Canal and San include measures for the post-construction <br /> Francisco Bay. Deposition of these soils stabilization of all disturbed ground. <br /> through natural sedimentation could <br /> adversely affect the carrying capacity of drain Implementation of this measure would <br /> lines, pumping equipment and open reduce these potential soil erosion impacts <br /> channels, increasing flooding potential and to a less-than-signii►cantlevel. <br /> maintenance requirements. In addition, <br /> suspended sediment would degrade water <br /> quality in the canal and in the bay by <br /> increasing turbidity levels. These possible <br /> effects of project-related soil erosion <br /> re resent a otentiall si nii►cantim act. <br /> Impact 15�: Settlement and Foundation Mitigation 15�. The detailed,design-level Applicant City Prior to grading <br /> Movement. The projecYs preliminary geotechnical investigations required under permit issuance; <br /> geotechnical studies determined that Mitigation 15-1 for each project prior to building <br /> structural loads imposed by buildings more construction phase shall include a permit issuance;field <br /> than approximately three stories in height thickness and consolidation analysis of all verify implementation <br /> would likely exceed the bearing capacity of clay soils underlying proposed building during grading and <br /> either fill or weakly consolidated Bay mud locations. This analysis shall be sufficient construction <br /> underlying conventional shallow foundations. to accurately estimate the rate and total <br /> Such buildings would potentially experience amount of consolidation expected to occur <br /> gradual but excessive long-term total and in response to building construction,as well <br /> differential settlements. These possible as the likely magnitude of differential <br /> settlement effects represent a potentially settlement. Building foundations,surface <br /> significant impact. improvements,and utility connections shall <br /> be designed to structurally withstand the <br /> associated movement,without disrupting <br /> either pedestrian or vehicular connections <br /> to the building. Implementation of these <br /> measures would reduce the potential <br /> compressible soil and settlement impacts <br /> to a less-than-signii►cant level. <br /> The requirement described in Mitigation 15- <br /> 1 for peer review of the recommended <br /> design-level geotechnical investigations,as <br /> well as for certification by the project civil <br /> engineer that all provisions of the <br /> investigation have been incorporated into <br /> the projecYs design and construction, <br /> would also apply to this mitigation and to all <br /> subsequent geotechnical and soils <br /> Page 34 34 r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />