My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-09-23 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-09-23 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 11:08:42 AM
Creation date
9/20/2013 9:10:50 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
9/23/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
751
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APF 8.A. - Page 73 TION MONITORING AND REPORTING PROGRAM <br />Implementation Tables <br />The MMRP includes tables that facilitate the implementation of all mitigation measures presented <br />in the EIR. The measures are identified by environmental resources. Mitigation measures span all <br />phases of the project, including pre -construction, construction, and project operation. <br />Each table is further divided into the following columns: <br />11&V�_LJJWFWECanng Ertl�ly } krn�lLrmq �llibnn dLed kk <br />A-4 <br />1) Column 1 includes the text of the mitigation measure to be implemented. <br />2) Column 2 includes the method of implementation <br />3) Column 3 includes the entity responsible for monitoring implementation, it is <br />assumed that the Applicants would be responsible for implementation of all <br />measures. <br />4) Column 4 includes the implementation schedule <br />Laurel Way Planned Development Revised Final EIR <br />February 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.