My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-09-23 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-09-23 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 11:08:42 AM
Creation date
9/20/2013 9:10:50 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
9/23/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
751
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX A. MITIGATION MONITORING AND REPORTING PLAN <br />Mitigation Leasure <br />the structures are supported on drilled pier foundations, which derive <br />support from the underlying native soils and bedrock. <br />c) All drilled pier foundations shall be designed for soil creep pressures. <br />d) Permanent drainage measures shall be installed on all lots to intercept <br />surface water infiltration and migrating subsurface water and thus <br />reduce the likelihood of soils becoming wet and unstable. <br />e) Drilled pier foundations shall be used for houses on sloping lots. <br />f) Detailed foundation explorations shall be performed for each lot during <br />the design -level geotechnical investigation to collect site-specific data <br />regarding slope creep, expansive soils, and serpentinite rock. <br />g) Garage slabs on grade, driveways, walkways, sidewalks, and pavers <br />shall have sufficient reinforcement and be supported on a layer of non - <br />expansive fill. <br />h) All residences, retaining walls, and bio -retention basins shall be <br />supported on drilled, cast -in-place, straight -shaft friction piers or similar <br />construction. Consideration shall be given on a case-by-case basis to <br />the need for extra steel reinforcement of the piers and grade beams, <br />voids beneath grade beams to mitigate uplift distress to the structures, <br />perimeter subdrains and moisture barriers, and construction <br />precautions for concrete over -pours at the tops of the drilled piers. <br />i) Proper detailing of construction and control joints for concrete slabs <br />shall be considered in the final design of sidewalks and patios in areas <br />of expansive soils. For example, a construction joint with rebar dowels <br />may be provided when concrete slabs on grade meet the proposed <br />perimeter foundation for the residence to minimize vertical offset from <br />soil expansion or shrinkage. <br />.j) A detailed creek bank evaluation shall be performed during the final <br />geotechnical investigation once grading and improvement plans are <br />available. <br />k) The design -level geotechnical investigation for Lot 13 and all lots along <br />the downhill side of Laurel Way shall evaluate the potential for creek <br />bank erosion or landsliding, and provide mitigation measures as <br />appropriate. <br />1) All proposed structures and improvements shall be set ei <br />Impiemerltat+enl Monitoring Entity ImpJamentat3orr <br />Monitoring A tRhod Schedule <br />construction activities <br />040 <br />v <br />cc <br />m <br />00 <br />CIO <br />A-14 Laurel Way Planned Development Revised Final EIR <br />February 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.