Laserfiche WebLink
APPENDIX A: MITIGATION MONITORING AND REPORTING PROGRAM <br />Mit] <br />undocumented fill with engineered fill; <br />c) Recommendations to reduce impacts to utility facilities arising from <br />differential movement related to expansive soils; <br />d) Recommendations to reduce impacts to shared hardscape (i.e., <br />roadways and sidewalks) from expansive soils; <br />e) Recommendations to reduce impacts to the drainage improvements <br />from expansive soils; <br />f) Recommendations to reduce the potential for post -construction slope <br />instability in the vicinity of site improvements; <br />g) Recommendations for general site grading, including cuts, fills, and <br />corrective grading measures; and <br />h) Recommendations for stabilizing home sites by supporting the homes <br />and any site retaining walls on drilled piers. <br />Implomentatlool Monitoring Entity <br />Moffltorino. i4tetF�od <br />Mitigation Measure Geology -3: The soils excavated for installation of the water line <br />Building, <br />Building, <br />at the property boundary between Lots 10 and 11 shall be regraded to original <br />Infrastructure, and <br />Infrastructure, and <br />conditions unless the site-specific geotechnical report required by mitigation measure <br />Transportation <br />Transportation <br />Geology -2 recommends other measures for slope stabilization of Lots 10 and 11. <br />Department to review <br />Department <br />and approve grading <br />plans <br />Mitigation Measure Geology -4: The portion of the geotechnical report addressing <br />slope stability, required by mitigation measure Geology -2, shall be submitted with the <br />Tree Removal Permit application for review by the Redwood City Arborist. The <br />recommendations specific to tree removal may include but not be limited to the <br />following: <br />• Recommendations for preventing soil creep and landslides during <br />construction, if necessary, such as temporary excavation support systems; <br />• Recommendations to reduce the probability of landslide and soil creep <br />after construction; and <br />• Recommendations for stabilizing slopes during the drilling of piers for <br />foundations. <br />Laurel Way Planned Development Revised Final EIR <br />February 2013 <br />Building, <br />Infrastructure, and <br />Transportation <br />Department and City <br />Arborist to review and <br />approve geotechnical <br />report <br />recommendations <br />Building, <br />Infrastructure, and <br />Transportation <br />Department and City <br />Arborist <br />Implementation <br />*Schodulo <br />Prior to issuance <br />of building <br />permits <br />Prior to issuance <br />of building <br />piarrn its <br />v <br />A- 00 <br />rn <br />