APPENDIX A: MITIGATION MONITORING AND REPORTING PROGRAM <br />Mttination Meat ImnlinmentaticOMMAilliM Mi3nitorin a Entity S lmoletnent <br />"ornhoring Method=A6I v Schedule. <br />Mitigation Measure Hydrology -8: Drainage swales, bioretention basins, other <br />Building, Infrastructure, and <br />Building, <br />Prior to issuance <br />drainage elements, and conveyance infrastructure shall be designed with <br />Transportation Department <br />Infrastructure, and <br />of building <br />capacities to handle 100 -year storm flows. As part of the Phase I construction <br />to review and approve <br />Transportation <br />permits <br />plans submitted to the Building and Engineering Divisions for review and <br />Phase I construction plans <br />Department <br />approval, the applicant shall demonstrate that the proposed improvements would <br />accommodate 100 -year storm flows. <br />Noise <br />Mitigation Measure Noise -1: The applicant shall incorporate the following <br />Building, Infrastructure, and <br />Building, <br />Prior to issuance <br />conditions in all related construction contract agreements to reduce construction <br />Transportation Department <br />Infrastructure, and <br />of building <br />noise impacts: <br />to review and approve <br />Transportation <br />permits, and <br />• Muffle and maintain all equipment used on site. All internal <br />construction plans to <br />Department <br />throughout the <br />combustion engine -driven equipment shall be fitted with mufflers, <br />confirm that these items are <br />construction <br />which are in good condition. Good mufflers shall result in non -impact <br />included in the plans, and <br />process <br />tools generating a maximum noise level of 80 dB when measured at a <br />periodically monitor <br />distance of 50 feet. <br />compliance throughout <br />• Utilize Aquiet@ models of air compressors and other stationary noise <br />construction <br />sources where technology exists. <br />• Locate stationary noise -generating equipment as far as possible from <br />sensitive receptors when sensitive receptors adjoin or are near a <br />construction project area. <br />• Prohibit unnecessary idling of internal combustion engines. <br />• Prohibit the use of construction workers' radios within 50 feet of <br />adjoining properties. <br />Mitigation Measure Noise -2: Construction and construction maintenance <br />Building, Infrastructure, and <br />Building, <br />During <br />activities (including grading, excavating, paving, home building, and the cleaning <br />Transportation Department <br />Infrastructure, and <br />construction <br />and servicing of project vehicles or equipment) shall be limited to non -holiday <br />to periodically monitor <br />Transportation <br />weekdays between 7:30 a.m. and 5:00 p.m. <br />throughout construction <br />Department <br />Mitigation Measure Noise -3: All truck traffic, including the delivery of materials <br />Building, Infrastructure, and <br />Building, <br />During <br />and/or equipment to the site, will be limited to non -holiday weekday hours <br />Transportation Department <br />Infrastructure, and <br />construction <br />? <br />between 7:30 a.m. and 5:00 p.m <br />to periodically monitor <br />Transportation <br />throughout construction <br />Department <br />' <br />Laurel Way Planned Development Revised Final EIR <br />February 2013 <br />A- <br />v <br />m <br />N <br />