My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-09-23 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-09-23 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 11:08:42 AM
Creation date
9/20/2013 9:10:50 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
9/23/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
751
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 313 <br />S.A. - Page 71 <br />o In absence of Planned Development (PD) the developer wDuld like a hypothetical ESD for <br />30% slope lot. Five acres that includes following criteria <br />• Elevations, roads, driveways, profiles. is their proposal even feasible? <br />• Blo-retention basins supposed to gather water and dissipate gradually. Lot of deep <br />water. Goring to pave 5 acres. Will make drainage worse. Don't think Plan will work. <br />e EER did not adequately address seismic impacts <br />We will lose year round creek to retention. Prefer natural flow year round <br />o Mitigation measures insufficient Totally subjective <br />>. Hary could your concerns be addraesmW? <br />0 46.7a and 46.7b — plan should follow City's criteria for number of units <br />o Went City to look out for safety of citizens. Apply zoning laws <br />a City provide PAR (Floor/Area/Ratio) <br />4. What addifional infomwHon do you need about this proposal? <br />a Who's liable in case of slides? Who will pay? <br />a Does EIR reflect slides in past? <br />a Utility trench through outcropping makes no sense. How does trench affect <br />outcropping? <br />Will someone post a $25,000,000 bond to protect homes below? <br />o What is the development procedure? Cut? Trench? Step by step exactly what they're <br />going to do. <br />D Like to understand how creek downstream will be affected in normal and in storm <br />conditions. <br />o How much will the bio -retention basins hold? <br />* How mitigate 10 years of construction traffic? <br />Next Steps: <br />Mr. )any outlined the next steps in the process; <br />• The information gathered at this meeting will be typed up by the PCRC staff and submitted <br />to the Redwood City Planning Department. <br />c Notes will be emailed to everyone who supplied email addresses on the sign- sheet. <br />o Notes will be placed within the project information fide already on the web. <br />• A public hearing date for the City Council meeting on the appeal of the project EIR will be <br />set by the City Clerk, City Attorney and Mayou. <br />e Interested parties (everyone who signed in at the 3.24.11 community meeting, and everyone <br />an the City's mailing list in the project file i.e. 300 -foot radius, plus those who have <br />requested notification) will be notified of the hearing date by Redwood City Planning <br />Services. <br />4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.