My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-09-23 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-09-23 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 11:08:42 AM
Creation date
9/20/2013 9:10:50 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
9/23/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
751
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 364 <br />8.A. - Page 922 . <br />I 1901 BOA <br />marsic I pho4z t PHS <br />Honorable Mayor and Members of the City Council <br />August 15, 2011 <br />Pagel l <br />bubra ation Services. 20065 AMOMyLUary. 31 Jul. 2004.) The Commission's <br />response to this legit€mEm concern, i.e„ that this mititietion measure will <br />'eliminate any signifiom environmental impact, Mount$ to no more dIan a <br />proverbial leap of faith since the Commission lacks the reports and information to <br />know if mitigation would be sucoeadW (we do not belies it would be), <br />Momeover, the re}mrts wA mitigation studies the conmission docs have do not <br />account for consecutive winter was= and the attwdant long-term effacts on <br />erasion and damage fiom the degradation that will oeau during t!e devalopnmt <br />and consftedon phases of the pnojed. <br />o The FEM fails to adequately address potential "generation of excessive ground - <br />borne vl'bxation or gmund-borne noise kwds" (See CBQA Guidelirs, Appendix <br />G, CBQA Bavironarontal Cheeldist Form), whioh should be assumed will ocWr <br />when, far ex=pie, geology mitigations call for "drilled pier foundations and <br />compacted engi *red fi1L" (MM Mitigation Measure Geology -1 rioting the <br />need for drilled pier foundations.) <br />(c) IMS Proiect Wul Fleve mu at've Imp acts ave MA SM <br />I'tfimg&& Araah=& or Mitzi <br />Its addition tD im analysis of the project's impacts on baseline condition, CEQA rogWret the ETR <br />examine cmu&Ww impacts of other ,projects on the sabjed site. (CEQA Goiddfim, § 0130.) <br />130.) <br />It is important to nota drat the cumulative impacts of the propos d prof est have not yet been <br />addressed. For axampla, there appears to be a significant daMopmertt underway on Carryon <br />Latae, a rural area adjacent to Glenwood Avenue, which" itself abuts the steepest am of tlm <br />project. At lout 10 adjoining lots on Canyon Lane are owned by Casey Corwftuction, the last <br />lot having been aoquired by Gassy in July 2011. Reoarct pre-c.onstrvct n sodv* indicates <br />devokpUcat of the entire area could be imminexrt. The combined developa►ant of the Project <br />and the umby Canyon Lame world all but sm ound the property at and and of Glenwood and <br />certainly finther impact the wildlik mon and the vadant characteristica of the project site. <br />In &clditiorr, traffic will be sigalfecandy increased at the intersections of HW&nd and Canyon <br />Road, and at HWiland and Jei%son Avenue, <br />"Gassy Cawwxdon lis previoudy waved u a cma=sw to die CIr in cmwevrm with variant, dorm drain <br />prpjem ww* newly $1 ndflim <br />
The URL can be used to link to this page
Your browser does not support the video tag.