My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-09-23 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-09-23 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 11:08:42 AM
Creation date
9/20/2013 9:10:50 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
9/23/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
751
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 437 <br />Mayor Aguirre and Members of the City Council <br />April 15, 2013 <br />Page 5 <br />The Ci Cannot Defer Anal sis of the Pro'ect's Im acts b Re uirin <br />a Subsequent PD Permit for Individual Residences. At the eleventh hour, staff <br />informed the Planning Commission and the public that the Project would require only a <br />"master PD Permit," which would authorize construction of the infrastructure and would <br />approve the development of 16 residences only in concept. Individual PD Permits will <br />then be required prior to the development of individual residences. If this last-minute <br />bifurcation was meant to remedy the problem identified by SLW and others—i.e., that the <br />EIR illegally defers site-specific geotechnical studies, stormwater mitigation, and other <br />analyses and mitigation for the individual residences and the access road—it did not <br />achieve its goal. Such deferral of analysis is prohibited by CEQA.S The City cannot avoid <br />CEQA's requirement that project impacts be analyzed before project approval simply by <br />bifurcating the approval process itself. <br />For these reasons and the reasons stated in the attached documents, we urge <br />the City Council to reverse the Planning Commission's unsupported decision to certify <br />the EIR and approve the Project. Thank you for your attention to this appeal. <br />Very truly yours, <br />SHUTE, MIHALY & WEINBERGER LLP <br />Winter King <br />469230.3 <br />s In addition to the issues raised in SLW's earlier comments, it also appears that <br />the RFEIR fails to adequately describe the location of the road or that it will likely <br />require the removal of heritage trees and rock outcroppings outside of the delineated <br />Project site. In addition, it appears that some of the stormwater treatment measures are <br />also slated to be located where rock outcroppings exist. Obviously, such a location would <br />not be appropriate for detention/diffusion basins. The City must analyze these impacts <br />before taking action on the Project. <br />l[1 F II I,AI) <br />W1- I N l;llt('.11:.R, <br />
The URL can be used to link to this page
Your browser does not support the video tag.