My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 City of Menlo Park
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 City of Menlo Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2013 9:37:04 AM
Creation date
10/1/2013 9:37:02 AM
Metadata
Fields
Template:
Agreement
Contractor Name
City of Menlo Park and City of Redwood City
PROJECT NAME
Atherton Channel maintenance Marsh Creek from 101 east side to west side
RMP File Number
304.5
Date
9/30/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 of 2 <br /> copies of permits listed below by the date of commencement of work. The work to be <br /> done shall conform to the requirements of all permits: <br /> a. The California State Department of Fish and Game Project Conditions. <br /> Condition 2 requires that a three-foot buffer at the toe of each bank be left <br /> undisturbed. Condition 4 prohibits heavy equipment from operating from <br /> within the channel. Conditions 7 and 9 discuss silt control measures. This <br /> permit is effective through December 13, 2013. <br /> b. The Regional Water Quality Control Board (RWQCB) Waste Discharge <br /> Requirement (WDR) Waiver Conditions. The Board did not recommend <br /> issuance of a 401 Water Quality Certification for this project due to its low <br /> threat to water quality. <br /> c. The U.S. Army Corps of Engineers (USACE) 404 authorization. A 404 <br /> authorization is not required because disposal is off-site and there will be no <br /> violations of the Endangered Species Act. <br /> TRAFFIC CONTROL - POSTING AND NOTIFICATION AND MAINTAINING TRAFFIC: <br /> City of Menlo Park shall provide traffic control devices, e.g. cones, barricades, warning <br /> signs, etc., and other incidentals to control automobile traffic safely around the sites. <br /> The City of Menlo Park shall close the sidewalk next to Atherton Channel and re-direct <br /> pedestrian traffic during the days mobilization and work is in progress and while spoils <br /> are de-watered. The City of Redwood City shall handle worksite safety and vehicle <br /> traffic control if it is required, which shall comply with all City standards. Construction <br /> operations shall be conducted in such a manner to cause as little inconvenience to <br /> vehicle traffic as possible. <br /> CONSTRUCTION HOURS AND NOISE: Work hours shall be between 6:00 AM to 6:00 <br /> PM, Monday through Friday, and 6:00 AM to 6:00 PM, Saturdays, Sundays and <br /> Holidays, except when othennrise specified by the City Engineer. The City of Redwood <br /> City shall comply with City of Menlo Park Noise Ordinance 8.06. <br /> WORKER ACCESS TO FACILITIES: The City of Redwood City shall provide access to <br /> toilet facilities for its workers. There are no public facilities near the work site. <br /> POLLUTION CONTROL: The City of Redwood City shall follow all City NPDES <br /> requirements and Best Management Practices (e.g., straw or fiber rolls, storm drain <br /> filters) to keep sediment and miscellaneous litter and trash out of the Channel and storm <br /> drains. The City of Redwood City shall keep City right of way clean of sediment and <br /> debris, except for areas used for de-watering of spoils. After removal of de-watered <br /> spoils, the City of Redwood City shall leave the area in as clean a condition as it was <br /> before the work. <br /> ATTY/AGR/2013.168/ATHERTON CHANNEL MAINTENANCE <br /> REV:09-25-13 MLG <br />
The URL can be used to link to this page
Your browser does not support the video tag.