My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso13 PC 13-24 2920 PC Reso-Adopt the Intitial Study MND - Undercrossing
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2013
>
Reso13 PC 13-24 2920 PC Reso-Adopt the Intitial Study MND - Undercrossing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2013 4:16:25 PM
Creation date
10/22/2013 4:11:38 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
10/15/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9 Projeet De.rcription <br /> US '!01 PED�STRIAN UNDERCROSSING AND <br /> BAIR iSLAND STORM DRAIN PUMP STATION PROJECT <br /> This Initial Study and the Mitigated Negative Declaxation (MND) ass�ss the potential environmental <br /> impacts of the US 101 Pedestrian Undercrossing and Bair Island Storm Drain Pump Station I'roject <br /> for use in local planning and decision making. In compliance with the Califomia Environmental <br /> Qua]ity Ac� (CEQA),the City of Redwood City (City) decided to prepare a MND for the proposed <br /> project because the Initial Study found that,with the incorporation of appropriate mitigation <br /> measures,all potential impacts xe�ated to the project would be less than significant. <br /> 1 INTRODUCTI4N <br /> The proposed US 101 Pedestrian Undercrossing and Bair Island Storm Drain Pump Station Project <br /> would connect the Bayfront and Downtawn areas of the City with a joint-use path dedicated to <br /> bicycles and pedestrians under the U.S. Highway 101 (US 101) bridge at Redwood Cxeek. The <br /> paved path would follow an e�st�ng unpaved trail adjacent to the creek and provide a safe,eff cient <br /> connection between waterfront de�elopment on Bair Island Road northeast of US 101 and the <br /> existing commercial facilities along Convention Way anc�Main Street southwest of US 101. The <br /> upgrade and xepla.cement of the nearby stormwater pump station on Bair Island Raad would enable <br /> the station to handle the 100-yeat storm event in the a�ea. The pxoposed project also includes <br /> landscaping improvements to the City-owned paxcel south of Convention Way. <br /> 1.1 PROJECT LOCATION <br /> The propased project is located adjacent to US 101 in the eastern portion of the City. The City is in <br /> San Mateo County on the Sar�Ftancisco peninsula in northern Califarnia, appro�mately 27 miles <br /> south of San Francisco and 24 miles north of San Jose. Within the City,the Bayfront area and Bair <br /> Island Road are north and east of the project locarion,and the commercial developments on <br /> Convenrion Wap and Main Street are south and west of tl�e proposed locarion. The City's <br /> Downtown area is appro�mately 03 miles sonth of the project. Figure 1-1 shows a regional xnap of <br /> the pxoject locarion. <br /> 1.2 PROJECT BACKGROUND <br /> With an increase in development of the waterftant areas east of US 101,the City p�a.ns to improve <br /> pedestrian and bicpcling connections between the Bayfront and Downtown areas. An existing <br /> narrow foat trail crosses under the US 101 freeway bridge at Redwood Creek,but does not provide <br /> sufficient headroom and access for bicyclists. Upgxading this e�risting path to a joint-use pedestrian <br /> and bicycle path would connect the One Marina development and other potenrial Bapfront <br /> development projects on Bair Island Road with Convention Way and Main Street and pxovide <br /> access to the Downtown areas. <br /> 1-1 US 90� Pedestriara Undercro.csing and <br /> Baar Island Storm Drain Puriap Statfora Praject <br />
The URL can be used to link to this page
Your browser does not support the video tag.