Laserfiche WebLink
9 P�ject Description <br /> 1.6 OTHER AGENCIES WHOSE APPROVAL IS REQUIRED <br /> In additia�ta the City, the US 101 PedesYria�Undercrossing and Bair Isl��nd Storm Drain Pump <br /> 5tat�on Project woul.d require approvals from the followtng agenc�c-ti: <br /> Agenc3, ��ap���+al <br /> Pump Starion Faciliries <br /> Bay Area Air Quality Management District Authority to��c�,�yrruc� I+±r ci�i�rgc�c�,� �c+tez'atr�r <br /> ��Q�) <br /> Pedestrian UndercrossEng x'sci€ines <br /> California Depaxtment of Fish and Wildlife Streambed Alteration�gxeement <br /> (CDFW} <br /> California Department of Transportation Encroachment�'ermit <br /> (Caltrans} <br /> San Francisco Bay Regional Water Quality Section 401 Cextification <br /> Control Board (SFRWQCB) <br /> � .�. :1rr�4 {_�:}r�?� ;,'."Engineers (CJSACE) Section 404 Nationwide Permit (NWP} <br /> The City would apply to the USACE for a NWl' 14 (Linear Transportation Projects) for excavation <br /> and installation of the joint-use path facalities below the mean high ride elevarion of Redwood Creek <br /> and for a N WI' 33 (Temporazy Construction,Access, and Dewaterin� fo�the construction activities <br /> including the cofferdam in this area. The USACE wo�ald consult with the Natior�al Marine Fisheries <br /> Service (NMFS),the State Histaric Preservation Office (SHP�},and the US Fish and Wildlife <br /> Service prior to issuing its appxoval for the project. <br /> In addition,the project would file a Norice of Intentio�to complp urith the Califomia General <br /> Storm Water Construction Permit {Order No. 2012-006-DW� and would subrr�t a Storm Water <br /> PoIlution Prevenrion Plan (SWPPP) to the SFRWQCB. <br /> If the contra.ctor decides to truck or discharge dewatering to the publically-owned treatment system, <br /> the City would obtain an agreement or pernzit from the South Bayside System Authority (SBSA). <br /> 1.7 LIST OF PREPARERS <br /> Redwood City S#aff <br /> • Tanisha Wemer,Project Engineer <br /> • Michelle Littlefield,Associate Planner <br /> • Grace Le, Senior Ci�Engineer <br /> • Jirx�ny Tan,Senior Civil Engineer <br /> ] -l ] US �D� Pedestrzan Undercrossarag und <br /> Br�ir Islund Stor�n�Drain Pump Statiora Project <br />