My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-11-04 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-11-04 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2013 8:13:41 AM
Creation date
10/31/2013 4:53:32 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
11/4/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.2.A. - Page 11 ATTACHMENT I <br /> PERFORMANCE INCENTIVES AND DISINCENTIVES <br /> Exceptional Diversion Level PerFormance <br /> For Rate Years Two (2012) through Ten (2020) Contractor shall receive an incentive <br /> payment if the calculated Overall Diversion Level achieved by Contractor in any given <br /> Rate Year exceeds (i) the highest calculated Overall Diversion Level achieved by <br /> Contractor in a prior Rate Year during the Term or (ii) the Overall Diversion Level <br /> achieved by Previous Contractor in 2010 which shall include all Recyclable Materials <br /> Collected by Contractor during the Recycling Blitz. <br /> For example: <br /> • If the Previous Contractor achieves an Overall Diversion Level of 36.45% <br /> (including all Recyclable Materials Collected by Contractor during the Recycling <br /> Blitz) in 2010 and Contractor achieves an Overall Diversion Level of 35.58% in <br /> Rate Year One, the Contractor must achieve an Overall Diversion Level greater <br /> than 36.45% in any given Rate Year to receive an incentive payment. <br /> • If Contractor achieves Overall Diversion Levels for Rate Years Two, Three, Four <br /> and Five of 37.66%, 38.59%, 38.38% and 37.64%, respectively, Contractor shall <br /> receive an incentive payment for Rate Year Three only and the Overall Diversion <br /> Level that must be exceeded is 38.59% in future Rate Years, unless a higher <br /> Overall Diversion Level is achieved. <br /> The targeted Overall Diversion Level shall be calculated based on the methodology used <br /> in the following example: <br /> Example assumptions (actual results will be based on Contractor performance): <br />
The URL can be used to link to this page
Your browser does not support the video tag.