My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15303
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2013
>
Res13 15303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2013 10:49:01 AM
Creation date
11/6/2013 10:47:57 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
11/4/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11/04/2013 <br /> ATTACHMENT I <br /> PERFORMANCE INCENTIVES AND DISINCENTIVES <br /> 3. CONTAMINATION LEVELS <br /> Contamination Level Requirements <br /> The maximum Contamination Levels shall be: <br /> • Rate Year One (2011) Single-Family Targeted Recyclable Materials = twenty <br /> percent(20%)for the last six(6) months of Rate Year One (2011) <br /> • Rate Year Two (2012) through Ten (2020) Single-Family Targeted <br /> Recyclable Materials = TBD% <br /> "TBD" is: To Be Determined. The Rate Year Two (2012) through Rate Year Ten <br /> (2020) maximum Contamination Level will be established by calculating the <br /> arithmetic average of the quarterly results obtained from the sampling for Rate <br /> Year One (2011) conducted pursuant to Section 6.02.B and Attachment E-2. <br /> • Residential Organic Materials = 5% <br /> • Commercial Source Separated and Targeted Recyclable Materials = 8% <br /> � Commercial Organic Materials = 10% <br /> • MFD and Commercial Plant Materials = 5% <br /> Contamination Disincentive Payment shall be: <br /> • $175.00 per Ton for Single-Family Targeted Recyclable Materials <br /> • $70.00 per Ton for Commercial Source Separated and Targeted Recyclable <br /> Materials <br /> • $70.00 per Ton for Organic Materials <br /> • $70.00 per Ton for Plant Materials <br /> The Contamination Levels achieved will be determined based on the results of the <br /> Contamination Measurement Procedure conducted pursuant to Section 6.02.B and <br /> Attachment E-2. <br /> Contamination Disincentive Payment <br /> Contractor shall be assessed a disincentive payment for exceeding the maximum <br /> Contamination Level(s), based on the methodology shown in the following example: <br /> 9 RESO.#15303 <br /> MUFF#01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.