My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-11-18 Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-11-18 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2013 10:11:16 AM
Creation date
11/15/2013 3:48:02 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
11/18/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1 .E. - Page 4 <br /> SEGTION 00520 <br /> AGREE ENT <br /> forthe <br /> Gity of Redwood Gity <br /> 2012-2413 BREWSTER AVENUE OVERLAY PROJEGT <br /> THIS AGREEMENT, made this�day of , 201_, by and between <br /> whose place of business is at hereinafter <br /> called "C(JNTRAGT{7R", and the City af Redwaad Gity, a Charter City and municipal carparation <br /> of the State of California. hereinafter referred to as "CITY". <br /> In consideration of ihe mutual covenants hereinafter set forth, Gontractor and Gity agree <br /> as follows: <br /> I. WORK <br /> A. Gontractor shall complete all Work specified in ihe Gontract documents, in <br /> accordance with the Specifications; Drawings; and all other terrns and conditions of <br /> the Gontract documents. <br /> II. GONTRAGT 5UM <br /> A. City shall pay the Gontractor as the "Gor7tract Surn° for completion of Work in <br /> accordance with the Contract documents, as the amount of [$ Amount], computed <br /> ir7 accardar7ce witY� Contractor's Accepted Proposal dated, [dates], whicY� Propasal <br /> is incorporated herein by reference thereto as if fully set forth. <br /> B. The Gontract Sum is all indusive and includes all Work; all federal, state, and local <br /> taxes on materials and equipment, and labor furnished by Contractor, its <br /> suk�cor7tractors, suk�consultants, arcY�itecis, engir7ears, and ver7dors or atY�erwise <br /> arising out of Contractor's performance of the Work, including any increases in any <br /> such taxes during the term af this Agreement; and any duties, fees, and royalties <br /> imposed with respect to any materials and equipment; labor or services. The taxes <br /> cavered hereby include (but are nat lirnited to) occupatianal, sales, use; excise, <br /> car7err�ployrr�er7t, FIGA, ar7d incorne taxes, custorns, duties, ar7d any ar7d all other <br /> taxes on any item or senrice that is part of the Work, whether such taxes are <br /> narmally included in the price of such itern ar service or are normally stated <br /> separately. Notwithstanding ihe foregoing; each party shall bear such state or local <br /> inventary, real praperty, personal property ar fixtures taxes as may be properly <br /> assessed against it by applicable taxing authorities. <br /> III. GONTRAGT TIME AND LIQUIDATED DAMAGES <br /> A. Contractor shall complete the Work within the follawing Schedule reflecting the date <br /> the Gontract Time commences to run as set forth in Section 04550 (Notice to <br /> Proceed) and Section 40700 (General Conditions); and <br /> 1. Contractor shall achieve Substantial Gompletion of the Work within 45 <br /> Calendar Days fram the date the Gontract Time camrnences ta run. <br /> AGREEMENT 00520-1 <br /> 2012-2013 BREWSTER AVENUE OVERLAY PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.