My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-11-18 Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-11-18 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2013 10:11:16 AM
Creation date
11/15/2013 3:48:02 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
11/18/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1 .F. - Page 16 <br /> requests for information (RFIs). Consultant will visit the site up to three times during construction to <br /> observe the progress and construction of the improvements. <br /> 5. c Construction As-Builts <br /> After construction is complete, Consultant will prepare the as-built drawings based on redline <br /> markups provided by the City engineer. As-built changes will be reflected in the AutoCAD <br /> drawings. <br /> Task 5 Deliverables: <br /> • Responses to bid period questions <br /> • Comments on contractor submittals <br /> • Responses to contractor RFIs <br /> • Attend one pre-bid meetings and three site visits during construction <br /> • As-built drawings in AutoCAD and PDF format <br /> TASK 6—PUBLIC OUTREACH <br /> Consultant will assist with the public outreach process by attending up to two (2) public meetings with the <br /> City and help with presentation of the proposed project improvements. Consultant will prepare plans and <br /> exhibits for the public meetings and will be available to answer questions from the community. <br /> Task 6 Deliverables: <br /> • Up to 3 poster boards illustrating the project design for each community meeting <br /> • Exhibits for each community meeting <br /> Schedule <br /> Task 1 - Project Management—Ongoing, starting at Notice to Proceed <br /> Task 2 - Project Initiation/ Preliminary Design Phase—65 Days <br /> Task 3 - 75% Design Phase—30 Days <br /> Task 4- Final Design Phase—30 Days <br /> Task 5 - Construction Engineering Support—Variable, depending on construction schedule <br /> Task 6—Public Outreach—first meeting prior to initiation of Task 3 and second meeting (if needed) prior <br /> to initiation of Task <br /> ATTY/AGR/2013.216/MARK THOMAS&CO <br /> REV: 11-7-13 VR <br /> Page 13 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.