Laserfiche WebLink
8.A. - Page 37 <br /> whose basement level would be completely below grade. The principal open space <br /> component for project residents would be a 34,200 square-foot landscaped outdoor <br /> podium atop the parking structure at the third floor level; the outdoor podium would be <br /> wrapped on three sides by residential units and their private patios. Overall project <br /> height would be 10 stories, or 114 feet at the highest roof level. <br /> The parking structure would encompass the entire building footprint, with three <br /> residential lobby entrances, nine ground-floor residences, a residents' bike shop, the <br /> commercial space, and the leasing office wrapping the Jefferson, Bradford, and <br /> Middlefield perimeters of the structure. One tower would front on each of the perimeter <br /> streets, with each tower served by its own lobby entrance. A total of nine ground-floor <br /> residences would be located on Jefferson and Middlefield. <br /> The corner of Middlefield and Bradford would contain a new approximately 10,500 <br /> square-foot space far the San Mateo Credit Union branch and mortgage center (SMCi� <br /> that is currently on-site. The corner of Jefferson and Bradfield would contain a 3,000 <br /> square-foot project leasing office. Each of these spaces would include its own street <br /> frontage and entry (the SMCU would also include a walk-up AT1Vn, and public parking <br /> for each would be in the project parking structure. Sidewalk landscaping would include <br /> new street trees and landscaping between the building fagade and the sidewalk. The city <br /> sidewalks would be reconstructed adjacent to the project boundary and would extend to <br /> Veterans Boulevard on both Jefferson and Middlefield, as would new street trees and <br /> pedestrian lighting. <br /> Development on the site is regulated by the Downtown Precise Plan(DTPP). <br /> Existing Uses On-Site <br /> The 525 Middlefield project site encompasses the entire block bounded by Veterans, <br /> Jefferson, Bradford, and Middlefield except for a retail center facing Veterans along the <br /> north edge of the block. The project site is currently fully developed with approximately <br /> 30,700 square feet of commercial space within seven one- and two-story buildings with <br /> surface parking. These existing uses include the SMCU, the Baker's Union, Wings <br /> Learning Center, and various small-scale office space. The SMCU would relocate <br /> temporarily then move into its new space in the 525 Middlefield project. Wings Learning <br /> Center would relocate to 1201 Main Street in the DTPP area, and the Baker's Union has <br /> also found a new location. All on-site existing improvements would be vacated, <br /> demolished, and cleared. <br /> Previous CEQA Analysis <br /> On January 24, 2011, a program environxnental impact report(EIR) was certified by the <br /> City Council of Redwood City (Final Environxnental Ixnpact Report far the Redwood <br /> City Downtown Precise Plan, State Clearinghouse #200605202'�. The EIR assessed the <br /> potential environxnental impacts resulting from implementation of the DTPP. The DTPP <br /> established new land use, development, and urban design regulations far the 183-acre <br /> DTPP area for a 20-year planning period. The following Initial Study has been prepared <br /> to consider whether any new environmental effects not identified in the DTPP program <br /> EIR might be created by construction and operation of the 525 Middlefield project <br /> (CEQA Guidelines section 15168--Program EIR). <br /> 2 <br />