My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-12-09 Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-12-09 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2013 5:11:54 PM
Creation date
12/5/2013 5:05:07 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
12/9/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4.1.C. - Page 1 <br /> RE PO RT <br /> To the Honorable Mayor and City Council <br /> From the Cit Mana er <br /> December 9, 2013 <br /> SUBJECT <br /> Amendment No.1 to professional services agreement with Bellecci and Associates for <br /> civil engineering and design services for the Middlefield Road Underground Utility <br /> District and Streetscape Project <br /> RECOMMENDATION <br /> By motion, approve and authorize the City Manager to execute Amendment No.1 for <br /> $30,220.00 to the agreement with Bellecci and Associates for additional civil <br /> engineering and design services for the Middlefield Road Underground Utility District <br /> and Streetscape Project for a total contract amount of $140,220.00. <br /> BACKGROUND <br /> On December 12, 2011, the City Council approved and authorized the execution of an <br /> agreement with Bellecci for civil engineering related to the Middlefield Road <br /> undergrounding. The agreement includes underground utility locating and mapping of <br /> the existing utilities, preparation of a boundary map and legal description of the <br /> underground district, and preparation and distribution the Joint Trench Intent Drawings <br /> (Intent Drawings) for a total amount of $110,000. Amendment No.1 in the amount of <br /> $30,220 will increase the total of the agreement to $140,220. <br /> ANALYSIS <br /> The scope of services under Amendment No.1 includes adjustments to the adopted <br /> boundary map required by PG&E, revisions to the legal description, distribute <br /> resubmittals to the utility companies and coordination with the utility companies during <br /> their review phase of the Intent Drawings. For the streetscape design, additional <br /> information about the right-of-way is required to determine the feasibility of design <br /> alternatives. <br /> Bellecci will prepare a property analysis related to the existing street cross sections. <br /> This analysis will serve as the basis for the preliminary streetscape design alternatives <br /> and cross sections from Main Street to Woodside Road. They will also prepare <br /> construction cost estimates. They will finalize a City/County cost sharing ratio exhibit for <br /> an agreement between the City and the County required by the PG&E Rule20A <br /> Program. <br />
The URL can be used to link to this page
Your browser does not support the video tag.