Laserfiche WebLink
4.1.C. - Page 1 <br /> RE PO RT <br /> To the Honorable Mayor and City Council <br /> From the Cit Mana er <br /> December 9, 2013 <br /> SUBJECT <br /> Amendment No.1 to professional services agreement with Bellecci and Associates for <br /> civil engineering and design services for the Middlefield Road Underground Utility <br /> District and Streetscape Project <br /> RECOMMENDATION <br /> By motion, approve and authorize the City Manager to execute Amendment No.1 for <br /> $30,220.00 to the agreement with Bellecci and Associates for additional civil <br /> engineering and design services for the Middlefield Road Underground Utility District <br /> and Streetscape Project for a total contract amount of $140,220.00. <br /> BACKGROUND <br /> On December 12, 2011, the City Council approved and authorized the execution of an <br /> agreement with Bellecci for civil engineering related to the Middlefield Road <br /> undergrounding. The agreement includes underground utility locating and mapping of <br /> the existing utilities, preparation of a boundary map and legal description of the <br /> underground district, and preparation and distribution the Joint Trench Intent Drawings <br /> (Intent Drawings) for a total amount of $110,000. Amendment No.1 in the amount of <br /> $30,220 will increase the total of the agreement to $140,220. <br /> ANALYSIS <br /> The scope of services under Amendment No.1 includes adjustments to the adopted <br /> boundary map required by PG&E, revisions to the legal description, distribute <br /> resubmittals to the utility companies and coordination with the utility companies during <br /> their review phase of the Intent Drawings. For the streetscape design, additional <br /> information about the right-of-way is required to determine the feasibility of design <br /> alternatives. <br /> Bellecci will prepare a property analysis related to the existing street cross sections. <br /> This analysis will serve as the basis for the preliminary streetscape design alternatives <br /> and cross sections from Main Street to Woodside Road. They will also prepare <br /> construction cost estimates. They will finalize a City/County cost sharing ratio exhibit for <br /> an agreement between the City and the County required by the PG&E Rule20A <br /> Program. <br />