Laserfiche WebLink
4.1.D. - Page 2 <br /> elements. The design of the creek side retaining wall was revised due to maintenance <br /> concerns for the specified materials. In an effort to reduce the number of electrical <br /> cabinets and pedestals in the area, the power for the joint-use path will be directed to an <br /> extra circuit in the service cabinet installed with the Bair Island Road Storm Drain Pump <br /> Station Project. <br /> The agreement cost is based on the consultant's hourly rate schedule. Staff believes <br /> the additional scope of work is comprehensive, represents a solid level of effort, and is <br /> essential to delivering a complete project. <br /> ALTERNATIVES <br /> Council may choose not to authorize the execution of Amendment 2 and direct staff to <br /> exclude the cathodic protection design for the micropiles and additional scope to <br /> change design of creek side retaining wall. <br /> FISCAL IMPACT <br /> Funds for this project were approved and appropriated in the Fiscal Year 2013/14 <br /> budget as Blomquist Avenue Extension Project which has an available balance of <br /> $1,262,780.14, as of September 30, 2013. <br /> ENVIRONMENTAL REVIEW <br /> As the lead agency under CEQA, City of Redwood City is conducting CEQA review <br /> concurrent with the design of this project. As the lead agency under the National <br /> Environmental Policy Act (NEPA), Caltrans has determined that the project meets the <br /> NEPA exclusion criteria as set forth in Section 771.117(c) (3), "Construction of Bicycle <br /> Facilities." <br /> �� =- `" <br /> : �=� <br /> , -��"�.A�� � � _ <br /> TANISHA WERNER, P.E. <br /> ASSISTANT ENGINEER II <br /> G <br /> BILL EKERN <br /> COMMUNITY DEVELOPMENT DEPARTMENT DIRECTOR <br /> �� <br /> ROBERT B. BELL <br /> CITY MANAGER <br /> ATTACHMENT <br /> 1. Amendment Number 2 to Agreement with WRECO for design and construction <br /> support services <br />