My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 NBBJ LP
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 NBBJ LP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2013 12:28:21 PM
Creation date
12/16/2013 12:28:19 PM
Metadata
Fields
Template:
Agreement
Contractor Name
NBBJ LP
PROJECT NAME
Additional Mechanical engineering and design services in support of City Attorney Office update
RMP File Number
304.5
Date
12/11/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT"A" <br /> SCOPE OF SERVICES <br /> Itemized List of what Consultant will do for City and at what price and schedule. <br /> Through its own services or the Mechanical Engineering subcontractor EXP, NBBJ <br /> will provide <br /> 1. TASK 1: Additional Mechanical engineering and design services in support of: <br /> Design and specification of City Attomey office zone supply air acoustical attenuators in <br /> accordance with Charles Salter report dated October 29, 2013. Design shall include 3- <br /> foot long duct sound attenuators downstream of the VAV boxes to meet NC 35 at the <br /> design airflow rates. The attenuators (e.g., from VibraAcoustics or equal) should be <br /> selected to meet acoustical ratings listed in Tables 2 and 3, below. Pressure drop across <br /> the attenuators should also be limited to a maximum of 0.1 inches W.G. <br /> TABLE 2 Minimum Dynamlc Insertlon Loss Ratings(dB) <br /> 63 Hz 125 Hz 250 Hz 500 Hz 1 kHz 2 kHz 4 kHz <br /> VAV Discharge Sound Attenuator 2 7 16 11 10 10 14 <br /> TABLE 3 Maximum Regenerative Sound Power Ratings (dB) <br /> 63 Hz 125 Hz 250 Hz 500 Hz 1 kHz 2 kHz 4 kHz <br /> VAV Discharge Sound Attenuator 60 59 50 46 43 42 42 <br /> 2. TASK 2: Prepare a bulletin directing The opposed-blade dampers be removed from the <br /> diffusers. In accordance with Redwood City, City Hall: City Attomey and City Manager <br /> Improvement Project Engineering Services Proposal dated 01/02/13. <br /> 3. TASK 3: Additional services, as requested by Citys Community Development Director, to <br /> be defined in writing, <br /> FEE <br /> Tasks 1 and 2 shall be performed on a Fixed Fee Basis for a total of Three Thousand Seven <br /> Hundred and Twenty dollars ($3,720), inclusive of all reimbursable expenses. <br /> Task 3 shall be an optional task in an amount not to exceed $1,280; the actual fee shall be <br /> developed by the City's Community Development Director at the time the task is further defined <br /> in writing. <br /> REV: 11-26-13 VR <br /> Page 5 of 5 <br /> ATTY/AGR.2013.236/NBBJ/Agreement for Design Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.