Laserfiche WebLink
2 Remove sediment, trash and debris from sedimentation As needed <br /> basin, riser pipe and filter bed, using vactor truck method. <br /> Dispose of sediment, trash, filters and debris properly. <br /> 3 Ensure that manufactured treatment measure drains After major storm events and as <br /> completely within five days. needed. <br /> 4 Inspect outlets to ensure proper drainage. Monthly during rainy season, or as <br /> needed after storm events <br /> 5 Follow manufacturer's guidelines for maintenance and As per manufacturer's specifications. <br /> cartridge replacement. <br /> ' Attached site plan must match the site plan exhibit to Maintenance Agreement. <br /> \\Bkf�rqvol6\MPIM�013U10150W�P�in-P�yliouonx-Plan OittF-COn6[ims\I IXM1m-RvelopmentAgreemmh�Stamwrtv F%HIBR GEOa Page <br /> � <br /> NDSApproved 12/5/07 <br /> ATTY/AGR/2013.218/STMMA 601 MAIN STREET <br /> REV: 11-12-13 VR <br /> Page 12 of 15 <br />