My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-01-13 Interview, Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-01-13 Interview, Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2014 8:33:06 AM
Creation date
1/9/2014 9:29:21 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
1/13/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
543
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 16 <br /> assembly, provided the assembly with the foam plastic insulation satisfactorily <br /> passes FM 4450 or UL 1256. <br /> Sec. 9.59. SECTION J102.1, APPENDIX J OF THE BUILDING CODE AMENDED: <br /> Section J102.1, Appendix J of the Building Code is hereby amended to add the definition <br /> of Engineered Grading: <br /> Section J102.1. Definitions. For the purpose of this appendix chapter, the terms, <br /> phrases and words listed in this section and their derivatives shall have the <br /> indicated meanings. <br /> BENCH. A relatively level step excavated into earth material on which fill is to be <br /> placed. <br /> COMPACTION. The densification of a fill by mechanical means. <br /> CUT. See excavation <br /> DOWN DRAIN. A device for collecting water from a swale or ditch located on or <br /> above a slope, and safely delivering it to an approved drainage facility. <br /> ENGINEERED GRADING. An excavation greater than two (2) feet in depth; where <br /> cut slope is greater than five (5) feet in height; where fill is to be placed on natural <br /> grade steeper than 20% (1:5 ratio); where fill is greater than three (3) feet in height; <br /> where fill supports a structure; or which consist of more than 50 cubic yards. <br /> EROSION. The wearing away of the ground surface as a result of the movement <br /> of wind, water or ice. <br /> EXCAVATION. The removal of earth material by artificial means also referred to <br /> as a cut. <br /> FILL. Deposition of earth materials by artificial means. <br /> GRADE. The vertical location of the ground surface. <br /> GRADE, EXISTING. The grade prior to grading. <br /> GRADE, FINISHED. The grade of the site at the conclusion of all grading efforts. <br /> GRADING. An excavation, fill, or combination thereof. <br /> KEY. A compacted fill placed in a trench excavated in earth material beneath the <br /> toe of a slope. <br /> SLOPE. An inclined surface, the inclination of which is expressed as a ratio of <br /> horizontal distance to vertical distance. <br /> ATTY /ORD.398 /BUILDING CODE ADOPTION <br /> REV: 11 -22 -13 JS <br /> Page 5 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.