My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord 2401
RedwoodCity
>
City Clerk
>
Ordinances
>
2010-2019
>
2014
>
Ord 2401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 3:04:40 PM
Creation date
1/16/2014 3:04:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Meeting Type
Regular
Agency Type
City Council
Date
1/13/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
01/13/2014 <br /> the SBWMA has included in its list of recognized Certified C&D Debris Recycling <br /> Facilities. <br /> The SBWMA shall include in its list of Certified C&D Debris Recycling Facilities <br /> only those facilities whereby the owner or operator of the facility submits <br /> documentation to satisfactorily confirm to the SBWMA: <br /> 1. That the facility has obtained all applicable Federal, State, and local <br /> permits, and is in full compliance with all applicable regulations; and <br /> 2. The percentage of incoming waste from construction, demolition, and <br /> alteration activities that is diverted from landfill disposal meets the required <br /> minimum percentage set forth in the standards recognized by the <br /> SBWMA. <br /> If available, the City will provide to each building permit applicant paying a <br /> diversion deposit a current list of SBWMA Certified C&D Debris Recycling <br /> Facilities. <br /> Sec. 9.195. - Information Required Before Issuance of Permit: <br /> WASTE MANAGEMENT PLAN: Applicants for projects affected under this <br /> Article shall submit a properly completed "Waste Management Plan" (WMP) on a <br /> form(s) provided by the City, and shall submit the form(s) to the City's <br /> Community Development Department, as a part of the building or demolition <br /> permit process. <br /> A) Prior to issuance of any building or demolition permit, Applicants must <br /> submit a complete and accurate WMP which then must be approved by <br /> the Chief Building Official or designee. The WMP must accurately <br /> estimate the tonnage of C&D Debris to be generated from the project and <br /> provide other information regarding the ApplicanYs plans for diverting <br /> materials generated by the Covered Project. <br /> B) The Chief Building Official or designee may require the Applicant to <br /> include in the WMP the following information: (1) the estimated volume or <br /> weight by material type of the Covered Project's C&D Debris, to be <br /> generated; (2) the estimated maximum volume or weight of such materials <br /> that can feasibly be diverted via reuse or recycling; (3) the vendor or <br /> facility that the Applicant proposes to use to collect or receive that <br /> material; (4) the estimated project completion date; and, (5) the estimated <br /> volume or weight C&D Debris that will be ultimately disposed of in a <br /> landfill or incinerator. In estimating the volume or weight of materials <br /> identified in the WMP, the Applicant shall use the Standardized <br /> Conversion Rates approved by the City for this purpose. <br /> ATTY/ORD.396/C&D ORD ADDING ARTICLE XI ORD.#2401 <br /> REV:11-26-13 MLG FORMERLY MUFF#305 <br /> Page 8 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.