My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 KJ Woods Construction Inc. Sewer Force Main
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 KJ Woods Construction Inc. Sewer Force Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2014 2:27:25 PM
Creation date
1/23/2014 2:23:56 PM
Metadata
Fields
Template:
Agreement
Contractor Name
KJ Woods Construction Inc.
PROJECT NAME
Sewer Force Main Replacement Project from PS 1 to MH
RMP File Number
304
Date
1/21/2014
MO Ref
13-210
Sticky Note
ID:
1
Text:
Performance Bond pages 5-9.
Payment Bond pages 10-14.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. <br /> . ����'IV�'•.�� <br /> SECTION 00520 <br /> AGREEMENT <br /> for the <br /> City of Redwood City <br /> SEWER FORCE MAIN REPLACEMENT PROJECT <br /> (FROM P.S. # 1 TO MH) <br /> THIS AGREEMENT, made this�day of , 20 by and between KJ <br /> Woods Construction Inc. whose place of business ' a 1485 Ba shore B d., Ste 149 <br /> San Francisco, CA 94124 hereinafter called "CO CTO , and the City of Redwood City, a <br /> Charter City and municipal corporation of the State of Califor ' , hereinafter referred to as "CITY". <br /> In consideration of the mutual covenants hereinafter set forth, Contractor and City agree <br /> as follows: <br /> I. WORK <br /> A. Contractor shall complete all Work specified in the Contract documents, in <br /> accordance with the Specifications, Drawings, and all other terms and conditions <br /> of the Contract documents. <br /> II. CONTRACT SUM <br /> A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br /> accordance with the Contract documents, as the amount of Two Hundred Sixty <br /> Eight Thousand and 00/100 Dollars ($268,000.00), computed in accordance with <br /> Contractor's Accepted �esa� Bid dated October 23, 2013, which�esal Bid is <br /> incorporated herein by reference thereto as if fully set forth. <br /> B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br /> taxes on materials and equipment, and labor furnished by Contractor, its <br /> subcontractors, subconsultants, architects, engineers, and vendors or otherwise <br /> arising out of Contractor's perFormance of the Work, including any increases in any <br /> such taxes during the term of this Agreement; and any duties, fees, and royalties <br /> imposed with respect to any materials and equipment, labor or services. The taxes <br /> covered hereby include (but are not limited to) occupational, sales, use, excise, <br /> unemployment, FICA, and income taxes, customs, duties, and any and all other <br /> taxes on any item or service that is part of the Work, whether such taxes are <br /> normally included in the price of such item or service or are normally stated <br /> separately. Notwithstanding the foregoing, each party shall bear such state or local <br /> inventory, real property, personal property or fixtures taxes as may be properly <br /> assessed against it by applicable taxing authorities. <br /> III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> A. Contractor shall complete the Work within the following Schedule reflecting the date <br /> the Contract Time commences to run as set forth in Section 00550 (Notice to <br /> Proceed) and Section 00700 (General Conditions); and <br /> 1 <br /> SEWER FORCE MAIN REPLACEMENT PROJECT <br /> (FROM P.S.#1 TO MH) <br />
The URL can be used to link to this page
Your browser does not support the video tag.