My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-01-27 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-01-27 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2014 4:32:38 PM
Creation date
1/23/2014 4:51:07 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
1/27/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.G. - Page 19 <br /> Exhibit A to Supplemental Agreement VI <br /> SOUTH BAYSIDE SYSTEM AUTHORITY <br /> EXHIBIT A <br /> A. DISTRIBUTION OF CAPITAL COSTS FOR STAGE ONE OF THE PROJECT <br /> Belmont San Carlos Redwood City Menlo Park <br /> 1. Menlo Park Pumping Plant& <br /> Force Main to Redwood City 0.0 0.0 0.0 100.0 <br /> 2. San Carlos Outfall from Existing <br /> Pumping Plant to New <br /> Pumping Plant 0.0 100.0 0.0 0.0 <br /> 3. New FM Booster Station and <br /> San Carlos Pumping Plant 0.0 40.0 0.0 60.0 <br /> 4. Redwood City Meter& <br /> Pumping Plant Modifications 0.0 0.0 100.0 0.0 <br /> 5. Harbor Industrial S.M.D. <br /> Metering Facilities 0.0 100.0 0.0 0.0 <br /> 6. Belmont Standby Power, Pumping <br /> Plant Modifications &Force Main <br /> Connection 100.0 0.0 0.0 0.0 <br /> 7. Subregional Treatment Plant <br /> at Redwood Shores 8.8 13.8 53.7 23.7 <br /> Notes: <br /> 1. Capital costs above include readily identifiable costs of construction, including <br /> engineering design, construction supervision and change orders during construction. Costs <br /> of special services, including soils studies, surveys, rights-of-way, legal and administrative <br /> expenses and preliminary engineering (including reports) are not included. <br /> 2. Costs of special services described in Note 1 above shall be distributed in accordance with <br /> each Agency's percentage of the total costs of constructing all of Stage 1 of the Project. In <br /> equation form this would be as follows: <br /> Agency percentage of special services costs =Agency Capital Costs <br /> Total Costs of Stage 1 of Project <br /> 3. The percentages set forth above are based on actual costs, exclusive of any State and/or <br /> Federal grants received. Should any such grants be received prior to, during, or after the <br /> completion of construction, they shall be returned to each of the Agencies, in accordance <br /> with the rules and regulations which govern at the time of receipt of such grants. <br /> 4. Capital costs above are based on the assignment of 40% to Flow and 30% to BOD and <br /> 30%to Suspended Solids and the Maximum Capacity Rights (Section 7.2). <br /> 12 <br /> S BSA_J PASu ppV I_052212r_120412rforsig] <br />
The URL can be used to link to this page
Your browser does not support the video tag.