My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-02-10 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-02-10 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 9:28:06 AM
Creation date
2/6/2014 4:03:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
2/10/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.2.C. - Page 18 <br /> clays of the Consultant's engineering team's time to assess all major visible, above-ground systems at the <br /> following pump stations: <br /> Price <br /> Veterans <br /> Maple <br /> Oddstadt <br /> Kmart <br /> Bradford <br /> The pump station condition assessment task includes the development of a Technical Memorandum <br /> documenting the inspections. It is assumed the assessments will be visual assessments only and will not <br /> include diagnostic testing or entry into confined spaces. <br /> Deliverable;Technical Memorandum Documenting Pump Station Inspections. <br /> Schedule: to be completed by April 30,2014. <br /> 2. Storm Drainage Pipe Trunks <br /> Consultant's inspection of storm drainage pipe trunks shall include facilities selected in coordination with the <br /> City. The outfalls for each of the pump stations shall also need to be inspected by Consultant for <br /> sedimentation and gate operation. <br /> Consultant shall work with Remote Inspection Technologies (RIT) to use their services to gen-locate and to <br /> inspect existing pipe lines. These are robotic platforms with multiple sensor suites specifically designed for <br /> the internal assessment of a variety of pipeline types.This technique can provide spatial and elevation (X,Y,Z) <br /> information, pipe sizes (via a laser or sonar scan), still Images, and videos. The scans and videos will allow <br /> assessment of service conditions along pipe systems. <br /> Plan for Field Surveys and Inspection: Consultant shall perform each task as follows: <br /> 1. Prepare Overall GIS Map from database.The map will show all the City facilities. <br /> 2. Categorize facilities by size and geometry,age (for those with as-builts),known service problems,etc. <br /> 3. Define facilities to be inspected. These remote pipe inspections can be prioritized based on known <br /> problems, age,sedimentation probability,and other similar factors with input from the City. <br /> 4. Prepare inspection Plan. The plan will define which pipes will Include: 1.Visual inspection (SD or HD <br /> camera),2.Size and sediment information (LIDAR modeling). <br /> 5. Implement Inspection and Field Survey plans. <br /> A thorough QA/AC process shall be developed and followed by Consultant prior to incorporating the new <br /> data into the database. <br /> Deliverable:Video and Documentation of Storm Drainage Pipe Inspections. <br /> Schedule: to be completed by May 31,2014. <br /> Task 5: Capital Improvement Plan Development, Master Plan Report <br /> Preparation <br /> REV:01-15-1435 <br /> Page 15 of 18 <br /> ATTY/AGR.2014. 007/Wood Rodgers Storm Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.