My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res14 15325
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2014
>
Res14 15325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2014 9:14:07 AM
Creation date
2/12/2014 9:14:06 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
2/10/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agency so obtaining such relinquished rights shall be entitled to obtain maximum <br /> capacity rights equal to the sum of its initial rights plus its acquired rights. <br /> With respect to the first increment of Stage 2, the respective capacity rights <br /> of the Agencies accrued upon construction thereof; provided, however, that each <br /> Agency reimbursed the Authority according to its respective allocated share of the <br /> costs of construction thereof based upon its respective proportionate ownership of <br /> capacity rights pursuant to Subdivision (b) of Section 5.6 prior to acquiring any <br /> further capacity rights. With regard to subsequent increments, no such rights shall <br /> accrue until advance full payment therefor has been made, and the corresponding <br /> increment has been constructed pursuant to Subdivision (b) of Section 5.6. In the <br /> event any one, or more than one, increment is not so constructed, all potential <br /> capacity rights pertaining thereto shall terminate, and any payments therefor shall <br /> be disposed of in accordance with said Subdivision (b) of Section 5.6. <br /> Wastewater system connection permits or other forms of entitlement to use <br /> treatment capacity within the limits of the maximum capacity rights allocated to <br /> each Agency shall conform to the financing requirements for each increment of <br /> Stage 2 of the Project as provided in Subdivision (b) of Section 5.6. Such permits <br /> or entitlements issued to wastewater system users shall not be transferable <br /> except between owners of the land for which they were issued; provided, <br /> however, that each Agency may require that such permits or entitlements and the <br /> capacity rights pertaining thereto shall expire for non-use within a specified term <br /> following the operative date of the increment to which they pertain and that upon <br /> such expiration all treatment capacity rights thereunder revert to the issuing <br /> agency. No treatment capacity rights for any Substage of Stage 2 of the Project <br /> shall revert, or be relinquished to, or be acquired by, the Authority; provided, <br /> however, that inter-Agency transfers may be made subject to Commission <br /> approval as hereinabove and in Section 7.3 provided. <br /> (e) Limitations Exceeded. If the Authority shall notify any Agency in writing <br /> at any time that such Agency's use of the Joint Facilities has exceeded its <br /> maximum capacity rights, such Agency shall immediately take steps to reduce its <br /> use of the Joint Facilities so as to be within its maximum capacity rights. If any <br /> such Agency is unable to do so, it may, with written approval of the Authority (i) <br /> 9 <br /> SBSA_JPASuppVl_052212r 120412rtorsig] <br />
The URL can be used to link to this page
Your browser does not support the video tag.