Laserfiche WebLink
injury to the System, whether requiring structural or nonstructural repairs, that are directly <br /> caused by, or that result solely from the misuse by or negligent conduct or omission of, Host <br /> Group (as defined in Section 14 below) may be repaired by Owner, at Host's sole cost and <br /> expense,to the condition that existed before the damage. <br /> 6.2 The O&M and service warranty will be provided for a 10 year period or the term <br /> of this contract. The O&M and system warranty will provide support, problem diagnosis, on-site <br /> repair and preventative maintenance to make sure the system is functioning correctly for 10 years <br /> after the Site Commercial Operational Date. <br /> 63 Host Site Obli at�ions. Host shall, at its sole cost and expense, take all actions <br /> necessary to maintain each Site in a safe condition,to at least the same standard as it customarily <br /> maintains the common areas at the Premises. In addition, Host shall take reasonable precautions <br /> to protect the System from vandalism. Notwithstanding anything to the contrary in this <br /> Agreement, Host shall not be required to undertake any additional measures related to the <br /> monitoring and security of the System than it otherwise would in its normal course of business if <br /> the System were not installed on the Premises. For the avoidance of doubt, Host shall be under <br /> no obligation to maintain the System, signage or any other equipment installed by Owner within <br /> the Site. <br /> 6.4 Host Rights to Premises. Host further represents, warrants and covenants that it <br /> has obtained or it shall obtain any and all consents or approvals required in order for Owner to <br /> utilize the Premises under Section 1.5 of this Agreement and perform its obligations under this <br /> Agreement. <br /> 6.5 Suspension of Service. Owner shall be entitled to reasonably suspend delivery of <br /> Power Effciency Service to the Premises for the purpose of maintaining and repairing any <br /> System and such suspension of service shall not constitute a breach of this Agreement. Owner <br /> shall ensure that any suspension in the delivery of Power Ef�iciency Service to the Host shall not <br /> cause an interruption of electricity service to the Premises supplied by the Local Provider. <br /> 6.6 Notifications of Malfunctions and Emer e�cies. Each Party shall notify the other <br /> as soon as reasonably practicable following the discovery by it of any material malfunction of <br /> the System or interruption in the supply of Power Efficiency Service from the System ("Svstem <br /> Emergency"). Each Party shall designate and advise the other Party of personnel to be notified in <br /> the event of a System Emergency. <br /> 6.7 Structural Damage to Site Premises. Owner shall be liable for any damage caused <br /> by the System or the Owner's access to the Premises hereunder, including, without limitation, <br /> any damage to the business located at the Premises, damage to property, or injury to persons, or <br /> from any operation and/or maintenance activity of Owner resulting in such damage. Owner shall, <br /> within ten (10) business days from receiving notice of any such damage make all repairs. In the <br /> event Owner does not complete the repairs within ten (10) business days, Host shall have a right <br /> to make all repairs, and Owner shall reimburse Host for all costs related thereto incurred by Host <br /> within ten (10) days after presentation by Host to Owner of supporting documentation describing <br /> the work performed and the cost thereof. <br /> ATTY/AGR/2014.021/POWER EFFICIENCY CHARGING SITE <br /> REV:02-24-14 MLG <br /> Page 8 of 21 <br />