My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2014-017374
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Improvement Agreement
>
RecDoc 2014-017374
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2014 12:59:53 PM
Creation date
3/13/2014 12:54:58 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
One Marina - Bair Island Road Phase 2
Doc Num
2014-017374
Rec Date
2/28/2014
Address
Bair Island Road
Parties
RC Peninsula Park, LLC
MO Ref
13-087
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(1) and all other work, improvements, or construction required by or mentioned in the <br /> abovementioned plans and specifications, conditions of pernuts and all construction, <br /> appurtenances and improvements necessary as reasonable deternuned by the City <br /> Engineer to complete the aforementioned improvements, both within and outside of <br /> the abovementioned subdivision. <br /> The construction, installation and completion of the Improvements and all labor and materials furnished <br /> in connection therewith are hereinafter referred to collectively as the "Work." The Work and <br /> Improvements shall be in strict compliance with the provisions of Chapter 30 of the Redwood City Code. <br /> In the event a conflict exists between the Plans and the requirements of Chapter 30 of the Redwood City <br /> Code,the stricter requirement or standard shall govern,as determined by the City Engineer. <br /> 4. Completion Date. Developer will complete the Work within one year of the Effective <br /> Date. All Work will be completed in a good and workmanlike manner in accordance with accepted <br /> design and construction practices and consistent with the Improvement Plans. This completion date may <br /> be extended by City in its sole and absolute discretion at the request of Developer,which request shall be <br /> accompanied by a written assurance acceptable to the City Engineer that the securities required by <br /> Section 13 shall remain enforceable throughout the term of the extension. <br /> 5. Estimated Cost of Work. The engineer's estimated cost of the Work is One Million, Sixty <br /> Nine Thousand Dollars($1,069,000)("Estimated Cost of Work"). <br /> 6. Modifications to the Plans. Approval of this Agreement by City does not release <br /> Developer of its responsibility to correct mistakes, errors or omissions in the Improvement Plans. If, at <br /> any time, in the opinion of the City Engineer, in his reasonable discretion, the Improvement Plans are <br /> deemed inadequate in any respect, Developer agrees to make such modifications, changes or revisions as <br /> necessary in order to complete the Work in a good and workmanlike manner in accordance with accepted <br /> design and construction standards and consistent with the Conditions and Improvement Plans. <br /> 7. Repairs. Developer agrees to repair or have repaired in a timely manner at its sole cost <br /> and expense all public roads, streets, or other public or private property damaged as a result of or <br /> incidental to the Work or in connection with the development of the Property, or to pay to the property <br /> owner of any damaged road, street or property the full cost of such repair. In addition, Developer shall <br /> obtain the written acceptance of such repair or payment from any owner whose private or public properly <br /> was repaired by Developer or to whom Developer has paid the full cost of such repair in accordance with <br /> this Section 7. City shall be under no obligation whatsoever to accept the Work completed under this <br /> Agreement until such time as all repairs have been completed or have been paid for and written <br /> acceptances have been provided to the City Engineer. <br /> 8. Foreman or Superintendent. Developer shall give personal attention to the Work. A <br /> competent foreman or superintendent, satisfactory to the City Engineer in his reasonable discretion with <br /> authority to act for and on behalf of Developer, shall be named in writing by Developer prior to <br /> commencement of the Work, shall be present on the Property during the performance of the Work and <br /> may not be changed without advance notification to and the concurrence of the City Engineer. <br /> 9. Examination of Work. All of the Work shall be consistent with the Improvement Plans <br /> and performed to the satisfaction of the City Engineer, in his reasonable discretion. City and its <br /> authorized agents shall, at all times during the performance of the Work, have free access to the Property <br /> and the Work and shall be allowed to examine the Work and all materials used and to be used in the <br /> Work. <br /> ATTY/AGR/2013.053/IMPROVEMENT AGR-BAIR ISLAND RD PHASE II <br /> REV:04-18-13 VR <br />
The URL can be used to link to this page
Your browser does not support the video tag.