My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2014-017376 STMA and Amendment No 1
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2014-017376 STMA and Amendment No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 8:40:56 AM
Creation date
3/13/2014 1:07:45 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Stormwater Treatment Measures MaintenanceAgreement
Doc Num
2014-017376
Rec Date
2/28/2014
Address
Bair Island Road Phase 2
Parties
RC Peninsula Park, LLC
MO Ref
13-087, Amendment No 1 MO 15-083.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C . >r <br /> Bioretention Area � <br /> Inspection and Maintenance Checklist <br /> � <br /> i <br /> Property Address:Bair Island Road. Redwood Citv. CA Property Owner. R� Peninsula Park. LLC � <br /> � <br /> Treatment Measure No.: Date of Inspection: Type of Inspection: ❑ Monthly ❑ Pre-Wet Season i <br /> o After heavy runoff ❑ End of Wet Season i <br /> Inspector(s): ❑ Other. �' <br /> Defect Conditions Whmn Maintenance Is Maintenance Comments(Descrbe maintenance Results Expected When <br /> N�� Needed?(YM) completad and it needed maintenance was Maintenance Is Performed ; <br /> not conducted,note when it will be done) � <br /> 1.Starxiing Water When water stands in the bioretention There should be no are�s of <br /> area between storrris and does not standing water once inflow has <br /> drain within five days after raiMall. ceased. Any of the following may <br /> apply:sediment or trash blodcages <br /> removed,improved grade from head � <br /> to foot of bioretention area,or added <br /> underdrains. <br /> 2.Trash and Debris Trash and debris accumulated in the Trash and debris removed from � <br /> Accumulation bioretention area. bioretention area and disposed of j <br /> ProPerIY• � <br /> 3.Sedim�nt Evidence of sedimentation in Material removed so that there is no � <br /> bioretention area. clogging or blockage. Material is <br /> disposed of properly. <br /> 4.Erosion Channels have formed around inlets, Obstructions and sediment removed <br /> there aro areaa of bare soii,and/or so that water flows freely and <br /> other evidence of erosion. disperses over a wide area. <br /> Obstructions and sediment are ; <br /> disposed of prope�ly. ; <br /> 5.Vegetation Vegetation is dead,diseased and/or Vegetation is healthy and attrdctive <br /> overgrown. in appearance. <br /> 6.Mulch Mu�h is missing or patchy in All bare earth is covered,except <br /> appeararice. Areas of bare earth are mubh is kept 6 inches away from <br /> exposed,or mulch layer is less than 3 trunks of trees and shrubs. Mulch is <br /> inches in depth. even in appearance,at a depth of 3 <br /> inches. <br /> 7.Miscellaneous Any condition not covered above that Meet the design specifications. <br /> needs attention in order for the <br /> bioretention area to function as <br /> designed. <br /> Bioretention Area Maintenance Plan- Page 3 <br /> V:\200PVBtl1!-4i LW 1w/14�YiYA2p1]011"I�HPI��2 A�rwp4awv�I'w�e�,�yr![HIM'CO�e Mel�_�ww�W_YM C1Ai�Is <br />
The URL can be used to link to this page
Your browser does not support the video tag.