My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Ascent Elevator Services, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Under 100K PWS
>
Agmt14 Ascent Elevator Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2014 5:04:05 PM
Creation date
3/17/2014 5:03:58 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Ascent Elevator Services, Inc.
PROJECT NAME
Marshall St Garage Elevator Refurbishment Project
RMP File Number
304
Date
3/17/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 00800 <br /> SPECIAL CONDITIONS <br /> 1.01 HOURS OF CONSTRUCTION <br /> A. Working hours shall be from 7:30 a.m. to 4 p.m. Monday through Friday, unless otherwise specified for <br /> off-peak hours. <br /> 1.02 PLANS <br /> A. Those certain plans entitled, MARSHALL STREET GARAGE ELEVATOR REFURBISHEMENT <br /> PROJECT; <br /> B. The City Engineering Standards; <br /> C. State of California, Department of Transportation, Standard Specifications and Plans, are hereby made <br /> a part of this contract. <br /> 1.03 TIME OF COMPLETION <br /> A. The work covered under these contract documents shall be diligently prosecuted in accordance with the <br /> schedule proposed by the Contractor and approved by the city to insure completion within thirty (30) <br /> calendar-days from the date of Notice to Proceed. <br /> 1.04 GENERAL TRAFFIC CONTROL,SAFETY&ACCESS <br /> A. Contractors shall comply with Section 01550, Traffic Regulations, or as directed. <br /> B. Contractor shall provide one 11-foot minimum width traffic lane for vehicular traffic in each direction of <br /> travel during construction. <br /> C. Contractor has immediate access to the work site within the corporate limits of Redwood City. <br /> Contractor shall limit his activities within the area indicated as limits of the Contract. No work shall <br /> proceed on site unless temporary barriers, fences, gates and protection are installed and functioning. <br /> 1.05 UTILITY SHUTDOWN <br /> A. No utility shall be disconnected without prior written approval of the Engineer. <br /> B. In the event operations of this project require that there be a temporary utility shutdown, the Contractor <br /> shall submit, in writing, notice of this requirement at least forty-eight (48) hours in advance of the <br /> operation. <br /> 1.06 DRAWINGS ON SITE <br /> A. A complete set of Plans and Specifications shall be kept continuously at the site. Copies of all change <br /> orders, letters, extra work orders shall be kept on the job at all times, and shall be available for <br /> inspection. <br /> 1.07 RECORDS <br /> A. Contractor shall keep accurate, detailed records of the type, character and extent of all work <br /> accomplished and time spent in the performance of each type of work and shall, upon request, furnish <br /> the Engineer with any information from these records, including the accumulative totals. <br /> B. Contractor shall submit to the City prior to final acceptance all as-built drawings, guarantees, <br /> maintenance and repair manuals as required. <br /> 1.08 PARTIAL ACCEPTANCE AND OCCUPANCY <br /> A. Partial acceptance of completed work may be considered at the discretion of the Engineer. <br /> B. The City shall have the right to occupy and use in any manner any or all portions of completed work <br /> which has been accepted. <br /> SPECIAL CONDITIONS <br /> MARSHALL STREET GARAGE ELEVATOR <br /> REFURBISHMENT PROJECT 00800-1 <br />