My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Ascent Elevator Services, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Under 100K PWS
>
Agmt14 Ascent Elevator Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2014 5:04:05 PM
Creation date
3/17/2014 5:03:58 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Ascent Elevator Services, Inc.
PROJECT NAME
Marshall St Garage Elevator Refurbishment Project
RMP File Number
304
Date
3/17/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. � <br /> � _ EXHI�IT....:� <br /> COMMUNITY DEVELOPMENT 1017 Middiefield Road <br /> DEPARTMENT Redwood P•O. Box 391 <br /> �I���B�If�B Redwood City,CA 94064 <br /> FIIq1�eA Illi Telephone:650.780.7380 <br /> Facs imile: 650.780.7309 <br /> www.redwoodcity.org <br /> January 13, 2014 <br /> TO: ALL INTERESTED CONTRACTORS <br /> RE: MARSHALL STREET GARAGE ELEVATOR REFURBISHMENT PROJECT <br /> The City of Redwood City is soliciting (informal) bids for the Marshall Street Garage Elevator Refurbishment <br /> Project. We invite you to submit a bid by 3pm, Friday, February 7, 2014, to the Engineering & <br /> Transportation Division, 1017 Middlefield Road, Redwood City, California 94063,attention Peter Delgado. <br /> The work of this project consists generally of the following items: <br /> • Removal and disposal of existing elevator cabs at Marshall Street Garage. <br /> • Furnishing and installing new steel faced cab panels, handrails, cab ceiling and lights, electrical <br /> connections and other work necessary to provide a complete functioning system. <br /> • Sysfem functional testing. <br /> Contractor shall perform all the work specified on the project plans and specifications, including furnishing all <br /> labor, miscellaneous materials, tools, equipment, and appurtenances necessary to complete the work in a <br /> satisfactory manner. <br /> All work perFormed shall conform to the attached contract documents and California Code of Regulations, <br /> Title 8, Elevator Safety Orders,and Cal/OSHA.. <br /> Work shall be completed within 60 Calendar Days from the date when Contract Time commences to run. <br /> Bidders shall refer to Section 00200(Instructions to Bidders)for required bid items to be submitted. <br /> A California Class C-11 contractor's license is required to bid this Contract. <br /> The Engineer's Opinion of Probable Cost for this project is between$80,000 to$90,000. <br /> . Contactor will be required to enter into an Agreement(Section 0052Q)for this work. Contractor shall satisfy <br /> insurance requirements specified in the Agreement. A Faithful Performance Bond (Section 00610) and a <br /> Payment Bond(Section 00620)will be required for this project. <br /> Contractor and all subcontractors shall pay their employees performing labor under this Contract salaries or <br /> wages at least equal to the general prevailing wage rates in effect at the time of advertising for bids, as <br /> determined by_ the Director of the Department of Industrial Relations of the State of California, for the <br /> particular crafts, classifications or types of workers employed on the project. <br /> City will conduct a non-mandatory pre-bid meeting at the following time and place. <br /> Time: 10:OOam to 11:OOam <br /> Date: January 30, 2014 <br /> Place: Marshall Street Garage, Elevator near Marshall Street,15t floor <br /> 750 Marshall Street,Redwood City, California <br />
The URL can be used to link to this page
Your browser does not support the video tag.