My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-03-24 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-03-24 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 4:19:04 PM
Creation date
3/20/2014 6:17:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/24/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 19 <br /> for the Project be tied to approval of marina permits. Should the Council have an <br /> interest in accommodating this request, staff believes that the condition can be <br /> amended to allow more flexibility but maintain the commitment that all approvals be <br /> obtained for the Project to proceed, as revised below for consideration: <br /> 6. The Applicant shall comply with any and all Federal regulatory or state agency <br /> requirements and obtain any and all necessary Federal regulatory or state <br /> agency approvals required for development of the Project other than the inner <br /> marina prior to commencement of construction. In addition, prior to the <br /> issuance of a Certificate of Occupancy for any residential unit, the Applicant <br /> shall obtain any and all Federal regulatory or state agency permits or approvals <br /> for the reconfiguration of the inner marina ("Other Marina Approvals"). The <br /> current configuration of the inner marina may not be removed or modified until <br /> and unless the Applicant has obtained all Other Marina Approvals for the new <br /> configuration of the inner marina. <br /> FISCAL IMPACT <br /> None anticipated. Review of the proposed project is subject to the City's Cost Recovery <br /> System; therefore, direct costs during the entitlement process associated with staff's <br /> time and materials are covered by an applicant deposit. Should the Project be <br /> approved, the Applicant will be required to pay development impact fees, as applicable <br /> and as established by ordinance. <br /> ENVIRONMENTAL REVIEW <br /> The environmental impacts associated with the proposed Pete's Harbor project have <br /> been analyzed in the Marina Shores Village Environmental Impact Report, (including <br /> Addenda No's 1 and 2), as previously described in this report. Section 2 of the 2014 <br /> Revised Addendum No. 2 (Attachment 9) describes the specific differences between the <br /> current Pete's Harbor Project and the 2003 EIR project. Section 3 of Revised <br /> Addendum No. 2 describes how the differences between the current Pete's Harbor <br /> project and the 2003 EIR project affect the impact and mitigation conclusions of the <br /> 2003 EIR. A summary of the revised impacts and mitigation measures is included in <br /> Table 1.1 of Revised Addendum No. 2, which verifies that the revisions incorporated in <br /> the current Pete's Harbor project would not result in new significant environmental <br /> effects or a substantial increase in the severity of the significant effects identified in the <br /> certified 2003 EIR. <br /> KAREN VAUGHN,AICP FOR <br /> AMIE MACPHEE, CONTRACT PLANNER <br />
The URL can be used to link to this page
Your browser does not support the video tag.