My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-03-24 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-03-24 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 4:19:04 PM
Creation date
3/20/2014 6:17:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/24/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 85 <br /> ATTACHMENT 3 <br /> 37. Prior to any Final Map approval, as applicable to the area encompassed <br /> by any Final Map, all applicable conditions of approval of the approved <br /> Vesting Tentative Map, as revised or amended, and Development Plans <br /> pertaining to subdivision improvements, shall be satisfied. <br /> 38. Public Utility Easements shall be dedicated for all public utilities, whether <br /> or not shown on the approved vesting tentative map. <br /> 39. Applicant shall prepare an engineering study to analyze and provide <br /> justification for the separate water system for fire to the satisfaction of the <br /> City Engineer. The City reserves the right to require one water system for <br /> both potable and fire use. <br /> 40. To reduce the risk of potential water quality issues, pipe dead-ends shall <br /> be avoided, and the pipe system shall be looped to the satisfaction of the <br /> City Engineer. <br /> 41. The onsite storm drainage system shall be designed so as not to <br /> detrimentally impact the City's storm drainage system, to the satisfaction <br /> of the City Engineer. <br /> 42. The applicant shall provide all field survey data related to the project. The <br /> data shall be provided in AutoCad drawing files. <br /> 43. The applicant shall retain a Civil Engineer to prepare "as-built" or "record" <br /> drawings, and the drawings shall be submitted in AutoCad format. <br /> 44. Continuous site inspection shall be provided by a Soils Engineer at the <br /> Developer's expense during trenching and backfill operations. The Soils <br /> Engineer shall take compaction tests, and shall submit test results to the <br /> City Engineer for approval. <br /> 45. The radii at the curb returns at the street entrances and at all turns shall <br /> accommodate the WB-50 truck turning template. <br /> 46. The applicant shall prepare a Notice of Intent (and submit a copy to the <br /> City) for the proposed grading operation. <br /> 47. Prior to Final Map approval, applicant shall secure all rights to off-site <br /> improvements necessary to serve the Project, to the City Engineer's <br /> satisfaction. <br /> 48. Minor corrections have been redlined on the submitted check prints and <br /> should be corrected and resubmitted by the applicant prior to the Final <br /> Map. <br /> ATTY/RES0.2954/PC PETES HARBOR-APPROVING THE PLANNED DEV PERMIT&VESTING TENTATIVE MAP W/CONDITIONS OF APPROVAL <br /> REV:O1/31/2014 VR <br /> Page 10 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.