Laserfiche WebLink
8.A. - Page 158 Pete's Harbor <br /> uiry or rceawooa illy Revised EIR Addendum <br /> January 22, 2014 Page i <br /> CONTENTS <br /> Page <br /> 1. INTRODUCTION AND SUMMARY 1-1 <br /> 1.1 Purpose of this Report 1-3 <br /> 1.2 Addendum Determination 1-6 <br /> 1.3 Summary of Addendum Conclusions 1-7 <br /> 2. PROPOSED PROJECT CHANGES 2-1 <br /> 2.1 Current Pete's Harbor Residential Community Project 2-1 <br /> 2.2 2003 EIR Project and Project Alternatives 2-6 <br /> 2.3 Current Assumptions for 2003 Peninsula Marina Property 2-35 <br /> 2.4 Differences Between the Current Pete's Harbor Project and 2003 EIR Project 2-35 <br /> 2.5 Required Jurisdictional Approvals 2-38 <br /> 3. CURRENT PROJECT RELATIONSHIP TO 2003 EIR CONCLUSIONS 3-1 <br /> 3.1 Land Use 3-3 <br /> 3.2 Visual Factors 3-6 <br /> 3.3 Population, Housing, and Employment 3-25 <br /> 3.4 Transportation and Circulation 3-27 <br /> 3.5 Biological Resources 3-37 <br /> 3.6 Hydrology and Water Quality 3-43 <br /> 3.7 Infrastructure and Public Services 3-45 <br /> 3.8 Soils and Geology 3-50 <br /> 3.9 Public Health and Safety 3-53 <br /> 3.10 Noise 3-54 <br /> 3.11 Cultural and Historic Resources 3-56 <br /> 3.12 Air Quality 3-57 <br /> 4. BIBLIOGRAPHY 4-1 <br /> 5. APPENDICES 5-1 <br /> 5.1 Water Supply Assessment Memo <br /> 5.2 Addendum Authors <br /> T:I10695 Pete's Harbor EIR Addendumlrevised addendum no 2lcontents (10695-01).doc <br />