Laserfiche WebLink
L <br /> Potential Potential > <br /> co co <br /> vD <br /> Significance Significance <br /> Without Mitigation With N -o <br /> Impacts Mitigation Mitigation Measures Responsibility Mitigation ca <br /> 0 <br /> Impact 8-2: Impacts on Essential Fish Habitat. S Mitigation 8-2. The applicant shall implement Applicant LS .ice <br /> Project development would involve reconfiguration Mitigation 8-1 above with respect to Essential Fish co <br /> of the inner marina, including installation of a public Habitat. This measure would reduce the project's -p <br /> hand boat launch on a floating dock. Project impact on Essential Fish Habitat to a less-than- <br /> construction activities could result in increased water significant level. <br /> turbidity, contaminant release and noise. These <br /> possible effects represent a potentially significant This mitigation may be integrated with Mitigation 9-3 <br /> impact. (Temporary Impacts from Inner Marina <br /> Reconfiguration). <br /> Impact 8-3: Impacts on the California Clapper S Mitigation 8-3. The applicant shall: (1)coordinate Applicant LS <br /> Rail. Project construction would occur adjacent to with the USFWS and CDFW on California clapper <br /> intertidal wetland along Redwood Creek and Smith rail issues; and (2)formulate and implement a <br /> Slough sufficient to support incidental foraging by Habitat Mitigation and Monitoring Plan(HMMP)for <br /> the California clapper rail, a federal-and state-listed this potentially affected species to the satisfaction of <br /> endangered species. Noise from project the USFWS and CDFW. The HMMP should <br /> construction and project disturbance of intertidal stipulate avoidance of construction operations during <br /> habitat could interfere with the ability of the clapper the California clapper rail breeding season.To <br /> rails to detect predators. Impacts on clapper rails determine presence of breeding special-status <br /> from noise associated with inner marina species in the project vicinity, USFWS-approved <br /> reconfiguration, auger cast pile installation, heavy clapper rail surveys should be conducted during the <br /> construction, and earthmoving equipment in breeding season, prior to construction. If breeding <br /> particular are potentially significant. These possible surveys detect clapper rail or other special-status <br /> effects represent a potentially significant impact. bird species'breeding territories in adjacent <br /> wetlands, the USFWS and CDFW shall be consulted <br /> to determine if the distance of the territory from the <br /> construction activity is a suitable buffer requiring no <br /> further action. If breeding territories are found to be <br /> potentially affected by construction-related noise, all <br /> construction activities should be prohibited within the <br /> buffer area as specified by the USFWS and/or <br /> CDFW. <br /> The City of Redwood City shall not issue a grading m <br /> permit for the project until the California clapper rail ° <br /> issues are resolved to the satisfaction of the USFWS m <br /> -0 > <br /> S = Significant m ca m _ <br /> LS = Less than significant a <br /> SU = Significant unavoidable impact c o <br /> NA = Not applicable <br /> T:I10695 Pete's Harbor EIR Addendumlrevised addendum no 21Table 1-1(10695-01).doc <br />