Laserfiche WebLink
v c_) <br /> Potential Potential <br /> • o <br /> Significance Significance <br /> Without Mitigation With N a <br /> Impacts Mitigation Mitigation Measures Responsibility Mitigation N, o <br /> 0 0 <br /> swale to slow flow velocities and to .A n <br /> increase infiltration opportunities. <br /> • Revegetate all disturbed areas at the onset <br /> (October)of the first winter rainy season <br /> following the completion of construction, and at <br /> a similar time during the next one to two years <br /> as required to fully revegetate the site. Use of <br /> an erosion control grass and forb mixture, <br /> favoring native species, is best suited to this <br /> task. In addition, install biodegradable surface <br /> erosion protection (e.g., natural mulch,jute <br /> netting, erosion control blankets, punched <br /> straw)to reduce the erosive energy of incoming <br /> raindrops for at least the first winter season <br /> following construction. If project construction <br /> spans two consecutive winter seasons, these <br /> erosion protection measures shall be <br /> implemented at the beginning of each winter <br /> season, unless there is successful <br /> establishment of vegetal cover after the first <br /> year. <br /> • Install silt fencing along the construction <br /> perimeter prior to the start of construction, and <br /> keep the fencing in-place until construction is <br /> completed and erosion-control winterization <br /> measures are implemented. <br /> • Prepare and implement an irrigation scheduling <br /> and chemical management plan governing the <br /> application of irrigation water and chemical <br /> amendments to landscaped areas adjacent to <br /> buildings and within or adjacent to parking lot a <br /> facilities. Components of such a plan likely m <br /> co D <br /> -D <br /> S = Significant • _ <br /> LS = Less than significant j 171 <br /> SU = Significant unavoidable impact Nco <br /> NA = Not applicable <br /> T:I10695 Pete's Harbor EIR Addendumlrevised addendum no 2ITable 1-1(10695-01).doc <br />