Laserfiche WebLink
L <br /> Potential Potential > <br /> co co <br /> vD <br /> Significance Significance <br /> Without Mitigation With N -o <br /> Impacts Mitigation Mitigation Measures Responsibility Mitigation �, ) <br /> oca <br /> established in the Redwood City noise ordinance. facilities so that construction activities and the - N <br /> This possibility represents a potentially significant event schedule can be scheduled to minimize <br /> short-term noise impact. noise disturbance. co <br /> • Noise Disturbance Coordinator. Designate a <br /> "noise disturbance coordinator"who would be <br /> responsible for responding to any local <br /> complaints about construction noise. The <br /> disturbance coordinator would determine the <br /> cause of the noise complaint(e.g., starting too <br /> early, bad muffler, etc.)and institute reasonable <br /> measures warranted to correct the problem. <br /> Conspicuously post a telephone number for the <br /> disturbance coordinator at the construction site. <br /> (The City should be responsible for designating <br /> a noise disturbance coordinator and the project <br /> applicant should be responsible for posting the <br /> phone number and providing construction <br /> schedule notices). <br /> • Construction Hours. Restrict noise-generating <br /> construction activity to between the hours of <br /> 7:00 AM and 7:00 PM, Monday through Friday. <br /> Prohibit such construction activities on <br /> weekends and holidays. <br /> • Construction Barrier. Construct a perimeter, <br /> solid plywood construction barrier, eight feet <br /> high,to shield nearby residential land uses from <br /> construction noise. Prohibit site access on <br /> common boundaries between the project site <br /> and adjacent residential land uses(e.g., the <br /> Villas at Bair Island)during construction phases. <br /> cn <br /> a <br /> m <br /> � CD <br /> S = Significant .0 m _ <br /> LS = Less than significant - a v <br /> SU = Significant unavoidable impact co 3 o <br /> NA = Not applicable <br /> T:I10695 Pete's Harbor EIR Addendumlrevised addendum no 2ITable 1-1(10695-01).doc <br />