My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-03-24 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-03-24 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 4:19:04 PM
Creation date
3/20/2014 6:17:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/24/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MIG F 8.A. - Page 281 <br /> City of Redwood City Revised Elm Huaenaurn <br /> January 22, 2014 Page 3-40 <br /> Pete's Harbor project construction activities could disrupt Redwood Creek and Smith Slough <br /> estuarine habitat and other adjacent sensitive habitat areas (e.g., Bair Island Wildlife Refuge) for <br /> one or more of these species. <br /> Conclusion. Slightly modified mitigation. The references to CDFG have been changed to <br /> CDFW. The mitigation identified in the 2003 EIR for Impact 8-4 as modified remains applicable <br /> to the current Pete's Harbor project and remains sufficient to reduce this impact to a less-than- <br /> significant level. As stated in the mitigation, if the required breeding surveys (subject to USFWS <br /> and CDFW approval) conclude to jurisdictional agency satisfaction that the distance of any <br /> identified special-status species territory from project construction activity represents a suitable <br /> buffer, no further action regarding the identified species would be required. <br /> Impact 8-5 Analysis: Project-Related Loss of Estuarine Navigable Waters and Other <br /> Waters of the U.S. The certified 2003 EIR indicated that the project would fill approximately <br /> 11.54 acres of waters under the jurisdiction of the Army Corps of Engineers (Corps) (also see <br /> Impact 8-1). The associated 2003 EIR mitigation described a series of related jurisdictional <br /> agency approvals that the applicant must therefore obtain, including: (1) Section 10 and 404 <br /> permits from the Corps, (2) a Section 401 certification or waiver from the Regional Water Quality <br /> Control Board (RWQCB), (3) a 1603 Streambed Alteration Agreement from the CDFG, and (4) <br /> an HMMP (as described under other 2003 EIR mitigations--see above). <br /> The current Pete's Harbor project would not fill any waters under Corps jurisdiction. <br /> Conclusion. Mitigation 8-5 is no longer required. The currently proposed Pete's Harbor project <br /> would not fill any navigable waters or other waters of the United States, and this impact would <br /> not occur. <br /> Impact 8-6 Analysis: Project Loss of Saline Emergent Wetlands. The certified 2003 EIR <br /> concluded that the Marina Shores Village project might fill an unspecified amount of existing <br /> saline emergent wetlands along the shorelines of Redwood Creek, Smith Slough, and the <br /> marinas. The associated 2003 EIR mitigation was similar to that for Impact 8-5 above, requiring <br /> various approvals by jurisdictional agencies (i.e., Corps, RWQCB, San Francisco Bay <br /> Conservation and Development Commission--BCDC), including associated HMMP provisions. <br /> The current Pete's Harbor project would modify, but not fill, saline emergent wetlands along the <br /> perimeter of the proposed reconfigured inner marina. The reconfigured marina would occupy <br /> the same 3.18-acre footprint as the existing marina. In comparison, the 2003 project would <br /> have resulted in the loss of saline emergent wetlands along much of the larger project's <br /> perimeter. Impact 8-6, therefore, would be greatly reduced compared to the 2003 project. <br /> Conclusion. Modified Impact and Mitigation 8-6. The references to "fill" wetlands have been <br /> replaced with "modify" wetlands. A cross-reference to Mitigation 9-3 (Temporary Impacts from <br /> Proposed Inner Marina Reconfiguration) has been added, and the references to CDFG have <br /> been changed to CDFW. The mitigation as modified remains applicable to the current Pete's <br /> Harbor project and remains sufficient to reduce the impact to a less-than-significant level. <br /> Impact 8-7 Analysis: Project-Related Loss of Fresh Emergent Wetlands. Similar to Impact <br /> 8-6, the certified 2003 EIR concluded that the Marina Shores Village project might also fill an <br /> unspecified amount of fresh emergent wetlands, which are located in patches entirely in the <br /> southwest corner of the Peninsula Marina property, at the intersection of Bair Island Road and <br /> T.110695 Pete's Harbor EIR Addendumlrevised addendum no 213(10695-01).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.