My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-03-24 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-03-24 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 4:19:04 PM
Creation date
3/20/2014 6:17:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/24/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MIG F 8.A. - Page 293 <br /> City of Redwood City Revised Elm Huaenaurn <br /> January 22, 2014 Page 3-52 <br /> Similar to the 2003 EIR mitigation for Impacts 11-1 through 11-4 above, mitigation details for <br /> Impact 11-5 would be included in the detailed, design-level geotechnical investigations required <br /> for both the previous project and the current project, including an evaluation of corrosive soils <br /> within the limits of all foundation and utility construction, and corrective measures to protect <br /> materials against corrosion from soil. <br /> Conclusion. No change. The mitigation identified in the 2003 EIR for Impact 11-5 remains <br /> applicable to the current Pete's Harbor project and remains sufficient to reduce this impact to a <br /> less-than-significant level. <br /> Impact 11-6 Analysis: Soil Erosion and Sedimentation. The 2003 EIR indicated that project <br /> development would disturb the site's natural topography and vegetative cover, leaving soils <br /> exposed to wind and water erosion during the construction period. The 2003 EIR concluded <br /> that the resulting sedimentation could increase flooding potential and maintenance problems in <br /> Redwood Creek and Smith Slough, and degrade water quality. This condition and identified <br /> potential for significant impact continues to apply to the current Pete's Harbor project. <br /> The associated 2003 EIR mitigation required an erosion control subject to City approval and <br /> consistent with the project-specific Stormwater Pollution Prevention Plan (SWPPP) required in <br /> the mitigation for Impact 9-1 (see section 3.6 of this Addendum). <br /> Conclusion. No change. It is noted that the project site is flat, with no "natural" topography; <br /> also, existing vegetative cover is minimal, consisting of introduced perimeter and parking lot <br /> trees. The mitigation identified in the 2003 EIR for Impact 11-6 remains applicable to the <br /> current Pete's Harbor project and remains sufficient to reduce this impact to a less-than- <br /> significant level. <br /> Other Impacts. The 2003 EIR determined that the previous Marina Shores Village project <br /> would have a less-than-significant impact resulting from surface failure/fault rupture. The <br /> current Pete's Harbor project includes no changes or new conditions that would alter this <br /> conclusion. <br /> T.110695 Pete's Harbor EIR Addendumlrevised addendum no 213(10695-01).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.