Laserfiche WebLink
u bl is improvements <br /> p . .� <br /> 1. Provide a new "Water Trail" public <br /> kayak/canoe launch dock <br /> 2. New 1/3 mile public waterfront bike, <br /> pedestrian and running trail along Smith <br /> Slough spur to the Bay Trail <br /> Four new public viewing areas <br /> 4. Public Bocce Ball, Children's tot lot and public <br /> areas <br /> 5. Rebuild Uccelli Blvd. to add grade separated sJ: . <br /> pedestrian and bike lanes and a link to the p , : :;, <br /> main stem of the Bay Trail ` <br /> �.. F• <br /> 6. Greatly improved pedestrian and bike 'o'• ` <br /> connections to Downtown Redwood City A o . •,,}: <br />