My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-03-24 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-03-24 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 4:19:04 PM
Creation date
3/20/2014 6:17:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/24/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Long-Term Ti 7.1.D. - Page 47 <br /> Implemented after MRP Effective Date and Prior to July 1, 2014: <br /> • The City did not install partial-capture devices within TMA#3 during this time period. <br /> Planned for Future Implementation between July 2014 and July 2022: <br /> • The City plans to evaluate the following for potential implementation.A decision regarding <br /> implementation will be made by July 1,2014.The City will evaluate and determine the <br /> feasibility of installing partial-capture devices to treat trash loads generated within TMA <br /> #3. If it is determined to be feasible and resources are available,the City will install partial- <br /> capture devices to treat TMA#3 by July 1,2015. <br /> • The City plans to evaluate the following for potential implementation.A decision regarding <br /> implementation will be made by July 1,2017. In accordance with their NPDES stormwater <br /> permit, Caltrans is required to implement trash control measures to reduce trash loads on <br /> state-owned streets,roads and highways. The City will collaborate with Caltrans to <br /> determine the possibility of entering into an agreement to offset the cost of installing <br /> partial-capture devices on El Camino Real.The City would be responsible for maintaining <br /> partial-capture devices. Implementation of partial-capture devices on El Camino Real will <br /> occur by July 1,2021 if the City executes an agreement with Caltrans regarding <br /> installation. <br /> ■STREET SWEEPING <br /> Implemented Prior to and Continued After MRP Effective Date: <br /> • El Camino Real and Woodside Road (between El Camino Real and Alameda de las Pulgas) <br /> are swept once/week. Both roads are swept between the hours of 4:00 a.m.to 6:00 a.m. <br /> All streets with retail and commercial land uses within TMA#3 are swept once/month <br /> between the hours of 4:00 a.m.to 6:00 a.m. Residential areas are swept once/month <br /> between 7:30 am and 2:00 pm. <br /> • All streets within TMA#3 are not posted with"No Parking- Street Cleaning"signs to <br /> prohibit parking during sweeping hours. In areas where sweeping is conducted between <br /> the hours of 4:00 a.m.and 6:00 a.m., cars are consistently not present when sweeping is <br /> conducted.As a result,sweeping practices are effective since the sweeper is reaching the <br /> curb.The presence of cars within residential areas is highly variable depending on when <br /> sweeping is conducted within the 7:30 a.m.to 2:00 p.m.time window. <br /> Implemented after MRP Effective Date and Prior to July 1,2014: <br /> • No additional street sweeping was implemented within TMA#3 during this time period. <br /> • Updated the"Street Sweeping"webpage on the City's website.This webpage provides the <br /> street sweeping frequency by residential area within the City. Residents may view a list of <br /> streets within a residential area to determine when their street is swept.The webpage is <br /> available at: http://www.redwoodcity.org/publicworks/streets/street cleaning.htm. <br /> Planned for Future Implementation between July 2014 and July 2022: <br /> • The City does not plan to increase street sweeping frequency within TMA#3 during this <br /> time period. However,the City plans to evaluate the following for potential <br /> implementation.A decision regarding implementation will be made by July 1, 2016.The <br /> City will evaluate and determine the feasibility of implementing a delayed street sweeping <br /> 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.