My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-04-07 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-04-07 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2014 8:30:06 AM
Creation date
4/3/2014 4:51:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
4/7/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.E. - Page 36 <br /> • Proposed specifications and standards. Redwood City shall supply "boiler <br /> plate" sections of the standard specifications as commonly used for <br /> similar work by Redwood City, from which Consultant shall modify as <br /> needed for this project, Consultant will develop all technical <br /> specifications. <br /> 90% Design Submittal and Review <br /> Consultant shall develop complete (90%) design plans and specifications for the project <br /> for Redwood City final review. Detailed design shall conform to all applicable water <br /> industry codes and Redwood City design standards; and shall be stand-alone bid <br /> documents. As delivered, the 90% documents shall be ready for advertisement and <br /> competition, to the extent practical, subject to any changes the Redwood City may <br /> identify or limited open issues. <br /> Consultant shall prepare an updated draft Engineer's Cost Estimate for construction <br /> activities. Consultant shall perform an internal QA audit of the designs to assure that <br /> the designs meet the intended project goals in a cost effective manner. <br /> Consultant shall assist Redwood City in responding to the 90% Design Review <br /> Submittal comments from Redwood City Operations, Maintenance, and Engineering <br /> staff. <br /> The following design assumptions shall apply: <br /> 1. Specifications shall be created using Redwood City general requirements <br /> and standard technical specifications. Redwood City shall provide <br /> electronic files for specifications. Consultant will provide all technical <br /> specifications. <br /> Deliverables. <br /> 1. Three sets (11" x 17") of drawings and specifications shall be provided to <br /> Redwood City for review at the 90% level of completion. Consultant shall <br /> have performed its internal quality control prior to this submittal. <br /> 2. Electronic files on CD diskette (or delivered by email) to Redwood City. <br /> 3. Preliminary Engineer's Estimate. Estimate shall include a breakdown of <br /> labor, material quantities, and unit prices. The estimate shall list all <br /> assumptions including overhead and profit, subcontract mark-ups, tax and <br /> contingency. Support documents shall be submitted with the cost <br /> estimate. <br /> 4. One set of 90% Calculations, stamped "Not for Construction". <br /> 100% Design <br /> Due to the need to keep costs separate for purposes of FEMA co-funding (if available), <br /> Consultant will develop the specifications and drawings for Carson reservoir assuming it <br /> is bid separately from other work elements (Tasks 1 and 2). Depending on what <br /> ATTY(AGRf2012.001/G&E ENGINEERING Page 19 of 30 <br /> RF\/•111 ti nil 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.